1000 Green Street
Russian Hill · San Francisco, CA 94133
-
1951
Designed by Oleg N. Ivanitsky and R. G. Watanobe. Advertisements and articles of the day called it the first high-rise apartment building of its type erected in San Francisco since the 1930s, and the city's citywide survey treats it as the start of the post-war wave of tall apartment construction on Russian Hill and Nob Hill.
-
Jan 1983
To bring building to full compliance with the provisions.
-
Nov 1983
Retro highrise electrical work.
-
Jun 1991
Reroofing.
-
May 1996
Kitchen & bathroom remodel.
-
May 1999
Smoke damage cosmetic repairs to unit.
-
Jan 2000
Installation of notifier ap-1010 panel.corrective plan action with in 30 days to fire dept.
-
Mar 2000
Otc alterations permit.
-
Dec 2001
Sub of as builts for review fire alarm installation for emergency repair #20000131702 corrective act.
-
Apr 2004
Expanding the existing fire alarm control panel to upgrade the fire alarm system to current code.
-
Aug 2004
Replace exiting kitchen cabients replace existing tile (2) bathrooms on m8/f one unit new vanities.
-
Sep 2004
Install n guardrails on roof of 13 story building. install 8 n roof anchors to be used for window cleani.
-
Jun 2005
Renew expired permit 200409174496 for final inspection.
-
May 2008
Relocation of 3 relay modules due to relocation of the elevator machine room to the roof. no new devices.
-
Aug 2008
B1 & b2 levels-add 10 new upright sprinklers for new storage lockers/cabinets.
-
Oct 2011
Replace & install new metal (aluminum) windows, penthouse ( @ rear & side). not visible from street. max u factor: .40 vif.
-
Oct 2011
Replace, install new metal (aluminum) window south elevation/pethouse street view east windows; front: (55), east: (12), penthouse(2).
-
Feb 2012
Correction to n.o.v.#201176596; kitchen remodel, new stackable washer & dryer @ bedroom #1. remodel 3-bathrooms, new closet @ bedroom #1. all work @ penthouse #2.
-
May 2012
Revision to appl.#201202154275. change closet door & bathroom door for bedroom #1 from swing to pocket door, master bedroom from single to double door @ master bath. rotate sink 90 degrees.
-
Sep 2012
Replace 36 existing double hung windows with casement type windows in west lightwell with "all weather" architectural aluminum window. fire district inspector to field verify that new windows do not reduce the existing clear width and height openings at bedroom locations on all levels below 4th story.
-
Apr 2013
Replacing 47 windows in west light well with all weather architectural aluminum window double insulated low e.
-
Mar 2014
#102 interior remodel to existing 1st floor condo unit that includes: remodel existing kitchen, remodel existing bathroom, relocate existing closet @ existing bedroom. work involves removal & relocation of interior non-bearing partition walls. compliance with ordinance #155-13 not required.
-
Aug 2018
Reroofing.
-
Sep 2022
Fire alarm ti: panel replacement, add, cellular communicator existing devices compatible with new notifier nfs2-3030 facp. voice command unit to be replaced.
-
Dec 2023
In like in kind kitchen removel with new cabinets, stone counters, and appliances for penthouse #1.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the developer, the early residents and the date of the last recorded sale. This building is dated 1951 in the historical record; the assessor's roll gives the parcel a build year of 1950. Submit an update