2 Folsom Street
South Beach · San Francisco, CA 94105
Permit history
-
Mar 2001
Address assignment.
-
Feb 2015
Gallery t.i to ground floor gallery/studio space including new partitions, electrical, plumbing, painting and lighting. no change of occupancy type. minor accessible upgrades. maher n/a. life safety deferred submittal.
-
Feb 2018
1st fl: ti project including demolition of floor finishes, existing lighting (ceiling to remain), new non-load bearing partitions, shelving, lighting and finishes. mep deffered. maher na.
-
Mar 2018
Amep ti project on 4th floor (9600 sq ft) that includes modifications to existing offices, building (6) new fit/dressing rooms and (1) boiler/laundry room. boiler to be pulled under separate permit. includes mep upgrades and structural support for new cabinets, fire under separate permits.
-
Jan 2019
New fire alarm riser for 2 hour survivability. install new electronics in existingtransponders 18 total. upgrade/modify facu with new elctronics. replace 506 strobes, replace 244 speaker/strobes.**maher n/a**.
-
Apr 2021
Level 3: selective demolition of existing partitions, light fixtures, and floor finish. construction of new partitions, floor finishes and ligth fixtures. crestroom upgrades, pantry upgrades, new structural supports for shelving, luminuous egress markings at egress stairs and exit passageways. mechanical and electrical.
-
Apr 2021
Level 2 selective demolition of existing partitions, light fixtures & floor finish. construction of new partitions, ceilings, fl finishes, pantry upgrade, restroom upgrade, new mother's room & structural suppoert for high density storage. luminous egress markings at egress stairs & exit passageways.
-
Apr 2021
Level 4: selective demolition of existing partitions, ceilings, light fixtures, and floor finish. construction of new partitions, ceilings, floor finishes and ligth fixtures. update of all restrooms per plan.
-
Apr 2021
Level 5: selective demolition of existing partitions, ceilings, light fixtures, and floor finish. construction of new partitions, ceilings, floor finishes and ligth fixtures. convert existing men's restrm to all gender restrm. update of all other restrooms. convert copy rm to mother's room.
-
Apr 2021
6th fl: construction of new partitions, ceilings, floor finishes + light fixtures. conversion of existing men's restroom to all gender restroom. update of all other restrooms. conversion of copy room to mother's room. luminous egress path. marrings at egress stairs + exit passage way.
-
Sep 2021
Tenant improvement for new retail space in ste 2a & 2b - fire alarm, fire sprinkler, signage, racking, under separate permit.
-
Sep 2021
Ti on ground floor interior remodel mercantile/interios space contained within the existing shell, suites. 2c + 2d fire alarm, fire sprinkler, signage, racking under seperate permit.
-
Sep 2021
Fl/8: - select demolition existing walls, light fixtures & floor finishes new interior partitions, finishes, light, fixtures, mep, structural support & update restrm. fl/7: selective demolition of (1) existing walls, light fixtures, new mother's room. upgrade restrooms.
-
Oct 2021
1st fl - selective demolition of existing partitions, ceiling tiles, millwork & light fixtures; construction of new partitions ceiling tiles & light fixtures.
-
Oct 2021
Selective demolition of existing partitions, light fixtures, and floor finishes. construction of new partitions, finishes, light fixtures, mep, structural supports and updated restrooms. installation of high density storage units.
-
Oct 2021
5th floor: selective demolition of existing partitions, light fixtures, and floor finishes construction of new partitions, finishes, light fixtures, mep, structural supports for installation of the high desity storages and updated restrooms.
-
Jul 2023
9/f: interior ti includes new non-load bearing partitions, lighting, millwork and finishes. mep deferred.
-
Jul 2023
10/f: interior ti includes new non-load bearing partitions, lighting, millwork and finishes. mep deferred.
-
Aug 2023
12/f - interior ti incudes new non-load bearing partitions, lighting, & finishes. mep deferred.
-
Sep 2023
9/f: mep associated with bpa#202307202579.
-
Apr 2024
7th fl - interior ti includes 3 new training spaces, office space & storage space. new non-load bearing partitions, ceilings, finishes & mechanical/electrical.
-
May 2024
3rd fl interior ti new non load bearing partitoins, doors, finishes. existing lighting shall remain with some fixtures to be relocated per new wall locations. mep deferred.
-
Jul 2024
15th fl ti: new partitons, ceilings, fixtures, finishes & mep.
-
Nov 2024
12th & 14th fl- interior demolition & ti. including install of new non load bearing partitions. install new lighting & receptacles. install new millwork. associated mep work.
-
May 2025
15/f: ti - new partitions, floor and wall finishes, doors, restrooms, and associated mep.
DBI holds 194 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 194.
Not yet documented: the developer, the early tenants, who designed the open space and the date of the last recorded sale. The assessor records 2000; SkyscraperPage records 2001. Submit an update