201 Spear Street
South Beach · San Francisco, CA 94105
Permit history
-
Dec 1980
Building use: offices/coml.
-
Feb 1985
New undeveloped floors, new partitions, electrical outlets.
-
Mar 1985
Typical building for new undeveloped floor/new partitions.
-
Dec 2005
Oti-1 12th floor el, me, l/s, sp.
-
Nov 2010
9th floor -project scope consists of construciton of new partitions, ceilings & finishes; mechanical, electrical, plumbing & fire protection are included in scope of work.
-
Jan 2013
Interior ti to existing office space on floors 8 & 9. work to include new conference rooms, pantry food prep room & communicating stairs connecting the 8th & 9th. includes mechanical and electrical. floors 8-9 becoming one zone for mechanical and fire alarm. sprinlers & fire alarm sep. permit.
-
Jun 2014
1st floor: modification of existing ground floor lobby, management office, bike room and lounge. includes demoliton and construction of exterior framed entry doors. replacement of exterior glazing, new entry canopy new light fixtures, ceiling work, millwork and finishes, mechanical, el & ls/spkl under.
-
Oct 2014
10th floor: tenant improvement include corridors, wall, & new partitions, doors & ceiling & lighting, restrooms upgrade & elevator lobby of 10th floor, mechanical & electrical under separate permit; maher n/a.
-
May 2015
Interior remodel, new walls, doors, ceiling and finishes. mechanical/electrical sep permit; maher n/a.
-
Feb 2017
5/f, 6/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes, paint, wall covering. mechanical. electrical, plmbing, life safety, stairs under seperate permit. provide card reader for doors and replace elev lobby doors. n/a ordinance #155-13.
-
Feb 2017
5th, 6th floor (m.e.p.)-m: base building ahv's to serve new vav units to condition occupied area. new heat pump for it room. e: new panelboards, xfrmrs & associated electrical infrastruct, ltg control sys. power to mechanical/plumbing equip. p: santary drainage, venting sys, hot/cold sys serving plumbing. ref#201702018381.
-
Feb 2017
4/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes throughout, paint, floor covering. also provide card readers on several doors. n/a ordinance #155-13.
-
Mar 2017
3/f- new partitions & gyp board ceiling, new millwork, counter tops & fixtures, new finishes throughout, paint & flooring covering. install card readers, replace toilets & urinals. n/a ordinance #155-13.
-
Mar 2017
Ref app#201703070829: mechanical: base building ahu to serve new terminal units to conditioned occupied area, new heat pump for it. electrical: new panel boards, transformers and associated electrical. infrastructure, lighting constrols.power to mechanical & plmg. plmg: sanitary drainage, venting system, hot/cold water.
-
Jul 2017
Installation of new gyp partitions & ceilings & lights. new millwork & finishes. demolition of existing interior partitions & t-bar/grid & lights. no exterior or structural work. n/a maher.
-
Aug 2017
On 13th fl - installation of electrical outlets devices and lighting controls to meet title 24. installation of new supply duct branches and wshp for it rooms. installation of insta hot water htr & associated new piping. reference app# 201707242796. n/a for maher.
-
Mar 2019
15th floor - construction of non bearing partitions, millwork and finishes., mep under sep permit.
-
Aug 2019
13th floor: installation of gyp bd partitions and ceilings, card readers, microkitchen with supporting equipment, plmg fixtures and electrical equipment and light fixtures, demolition of partitions and ceilings. n/a for maher.
-
Sep 2019
17th floor: partial demolition of partitions, suspended ceiling, and floor covering. installation of new partition, act, and gyp. board ceiling. new finishes throughout. installation of millwork, countertop and fixtures. repair finishes in restrooms. n/a for maher.
-
Dec 2024
18/f: ti for building and amentity spaces for conferencing and break area. work includes new partitions, ceilings, finishes, built in counters, storage, seating, and restrooms. exterior terrace imporvements includes new planting area, pedestal pavers, roofing, decorative. electrical deferred.
-
Aug 2025
18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom with new fixtures. new phone booth, power/data, lighting, ceiling, millwork and finishes. fls to be deferred permits.
-
Sep 2025
17th floor: ti consisting of interior demolition of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit.
-
Mar 2026
Spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fls deferred. ada upgrades at core restrooms and path of travel striping scope.
-
May 2026
14th fl. tenant improvement work with demolition of non-load bearing walls, doors and finishes, new construction of non-structural partitions, demountable partitions, doors, relocated light fixtures and finishes.
DBI holds 567 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 567. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and who designed the open space. Submit an update