221 Main Street
South Beach · San Francisco, CA 94105
Permit history
-
Jul 1981
Additions alterations or repairs.
-
Sep 1987
Install non-b partitions, sprklrs, plumb, electrical. work.
-
Nov 2003
Oti-1, 11th fl-el, me, ls, sp.
-
Jan 2013
Suite #940 & #1000-tenant improvement to include new offices, conference rooms, breakroom, shower room, uni-sex restroom & new finishes. mep under seperate permit.
-
Aug 2014
T.i. including new partitions and finishes. mep & lefe safety under seperate permit, new conference rooms, offices, pantry, open offices & phone rooms. n/a ordinance #155-13.
-
Oct 2014
3rd & 4th fl mep for work on permit application 201408254634 on 3rd and 4th floor. new vav boxes, transfer fans, new heat pumps and fsds (on 3rd floor only). connecting power to new or relocated light fixtures, power outlets and tenant equipment.
-
May 2015
Interior tenant improvement on the 8th fl. me[p, ls, fire sprinkler under sep permit maher not req.
-
Nov 2015
Interior non structural demolition, new partitions, millwork, finishes, ceiling maher not req.
-
Nov 2015
5th floor: t.i. includes demolition of non load bearing partitions & door assemblies, new partitions millwork, finishes new ceiling. mep & fire life safety under separate permit. maher n/a.
-
Jun 2016
Tiebacks for new construction at 160 folsom street ref appln #201406259481s - maher ordinance - extended - exempted.
-
Sep 2016
7th floor: ti - includes demolition non structural partitions and building new non structural partitions all new or revised hvac, electrcial, plumbing & life safety under separate permit build is fully sprinklered maher na.
-
Jul 2017
4th floor - patio - renovation of existing 4th floor patio and garden within a commercial property. landscape improvements to include reconstructing planter areas and program spaces.
-
Nov 2018
15th fl: ti to include dmeolition of non-load bearing partitionsm door assemblies, ceilings & light fixtures. new partitions, ceiling, light fixtures. mep under sep permit.
-
May 2019
2nd fl, ste 250 - ti selective demolition of non-load bearing partitions and modification of existing ti. selective demolition & construction of non-load bearing partitions. new office doors & frmaes, partial new ceiling grid/tile. mep under separate permit. life safety & sprinklers under separate permit.
-
Jul 2019
14th floor. tenant improvement to incl new partitions and finishes, ceiling, lighting, mechanical and electrical. life safety and fire sprinkler under separate permit.
-
Oct 2021
Ste 580: finish upgrade of existing office building. no change of occupancy, addition of new partitions, ceilings, millwork, new meps layout and interior finishes.
-
Nov 2023
8th floor. office ti. non-structural partitions. structural header for movable walls. new acoustical ceiling. new finishes. all interior work.
-
Apr 2024
Work on ground fl, consists of interior demolition of non-structrural elements indlcuding but not necessarily limited to, interior partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets & switches.addition ofnewgender neutral restrooms.
-
Jan 2025
16th floor: partial floor and ceiling demolition of existing tenant space. new interior partitios, ceilings, and finishes. mechanical and electrical work included.
-
Apr 2025
Priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit, private school for for grade 6-12, interior demolition of interior, including portion of 2nd fl structural slab fornew stair opening, construction ofnewparitions doors, ceilings, finishes, fixtures.
-
Dec 2025
6th fl - new construction, mechanical & electrical & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct.
-
Dec 2025
5/fl-new interior ti to include mechanical and electrical. structrual for movable wall. includes mep work.
-
Dec 2025
11/fl- ti demolition existing and build new partitions (non-structural) accoustical/ceiling, finishes, millwork new cafe.
-
Dec 2025
10/f. t.i new non structural partitions, ceiling, finishes, fixtures. demolition under permit application 202511069080.
-
Mar 2026
12th fl - interior ti in an existing building new construction of new partitions, case work & mep upgrades; millwork on 12th fl.
DBI holds 681 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 681. 13 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the early tenants and who designed the open space. The assessor records 1973; the Pacific Coast Architecture Database records 1975. Submit an update