South Beach · San Francisco, CA 94105
-
1973
Built as the Charles Schwab Building, a Corporate Modern tower clad in smoked glass and anodized aluminum.
-
May 1982
Building use: office.
-
May 1996
Demolition non structural, office improvements and abate asbestos.
-
May 1996
Upgrade hvac, electrical, fire protectin, accessibily for disabled.
-
May 1996
Structural upgrade for seismic requirements, & architectural.
-
Nov 1997
Structural work.
-
Mar 1998
Oti-1 9th floor el me l/s sp.
-
Jun 2000
Adding hyde elevator/pit/structural steel at lobby office/renovation.
-
Jun 2008
Demolition of mezzanine & build out of new ground floor lecture hall without fixed seating including accessory backstage/service use & restroom remodel for min fixture required. structural work performed.
-
Jul 2008
G/f lecture hall, without fixed seating & accessory back of house/service use, m.e.p & finishes upgrade restroom for min plumbing fixtures. structural work to be performed under this permit.
-
Jul 2008
At 17th fl: full tenant improvement, new non-load bearing partitions, ceilings & finishes, mechanical & electrical work at vav boxes, faus piping, new heap pump, power & signal outlets, lighting fixtures. fire sprinkler & ls under separate permit. no increase in office space. interior work only.
-
Nov 2008
Interior demolition, new drywall, ceiling work, doors, vav box, 1 fire damper, supply and return air.
-
Aug 2011
Break room and elevator lobby renovation with office addition including interior non load bearing partitions, doors, glazed office fronts, acuoustic tile ceilings, drywall ceilings and lighting. with associated mep. & communication. fire life safety to be under seperate permit.no structural work.
-
May 2012
Tenant improvement of existing interior space on 17th. floor.(single tenant). no structural work. relocation of mechanical diffusers & add lights, new partitions & lights, finishes & ceiling. under separate permit; fire/life safety.
-
Dec 2015
2nd floor: buildout of new offices millwork and finishes including mep. no structural work to be performed. n/a for maher.
-
Dec 2015
3rd floor: buildout of new offices millwork and finishes. no structural work to be performed. n/a for maher. sprinklers/alarms deferred.
-
Dec 2016
10/f: commercial tenant improvements to include new conference rooms, offices, and huddle rooms. new led lighting throughout. new ada upgrdes in the bathrooms. maher n/a.
-
Dec 2016
11/f: commercial tenant improvements to include new conference rooms, offices, and huddle rooms. new led lighting throughout. new ada upgrdes in the bathrooms. maher n/a.
-
Jun 2017
Tenant improvement project includes the new construction for auditorium, reception, & hallways including new mechanical, electrical & lighting work. n/a maher ordinance.
-
Jan 2018
7th floor - commercial ti to include private offices and ipgrades to existing office & conference rrooms. new led lighting throughout. new ada upgrades in restrooms. maher na.
-
Jan 2018
13th floor - commercial ti to include private offices and ipgrades to existing office & conference rrooms. new led lighting throughout. new ada upgrades in restrooms. maher na.
-
Apr 2018
5th floor demolition and renovation of office space.
-
May 2019
Ti- new private offices, upgrades to existing offices, conference rooms and break area. mep modifications and ada upgrades in restrooms.
-
Dec 2019
6th fl: commercial ti to include new conference storefronts, offices, breakroom, finishes, and ada upgrades in restrooms. new lighting throughout.
-
Jun 2020
9th floor: commercial ti to include new private offices & upgrade existing offices, conference rooms, & break area. new led lighting. new ada upgrades in restrooms. pre-app letters included on sheet 9 g1.0.
-
Sep 2020
16/f: t.i.: non-structural partitions, millwork, finishes, lighting & associated mep. ada upgrades to restrooms. maher n/a.
DBI holds 325 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 325. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and who designed the open space. The assessor records a year built of 1973; the Pacific Coast Architecture Database records construction in 1974. Submit an update