160 Spear Street
South Beach · San Francisco, CA 94105
Public art
- Tau — Roger Berry
Steel; open space in front of building; artwork is always accessible.
Installed 1984. This stainless-steel sculpture, 96 inches in diameter and 14 inches deep, forms four intersecting cones that each trace the sun's path through the solar year.
Permit history
-
Oct 1980
New construction.
-
Oct 1984
Partitions, fl.covering & wall finishes.
-
Aug 1985
Tenant improvement, partitions, ceiling, electrical.
-
Dec 1996
Cti-1 el me ls sp 16th floor.
-
Dec 2011
One unit: remodel e office suite, remove e walls and build new walls.
-
Dec 2011
9/f - emodel existing office suite. remove existing walls and build new walls.
-
Feb 2014
#1900: interior t.i. offfic, conference room, and lounge, break room. n/a for the maher ordinance #155-13.
-
May 2014
Tenant improvement on the 5th, 6th, 7th fl to construct new partitions, doors, finishes. mep on sep permit, fire alarm, sprinklers on separate permits.
-
May 2014
Mechanical-electrical to demolition, install and relocate equipment on 5th, 6th & 7th floor.t-1 phase refer to permit application 201405065051 fot t-i work. ** maher: compliance with ordinance no# 155-13 not required **.
-
Jun 2014
18th floor: interior t.i. to suite 1800. construct new conference rooms, focus rooms, break room. fire, life safety structural and sprinklers are under seperate permit. n/a for the maher ordinance #155-13.
-
Jun 2014
17th floor: interior t.i. to suite 1700. construct new conference rooms, focus rooms break room. fire, life safety, structural and sprinklers are under seperate permit. n/a for the maher ordinance #155-13.
-
Nov 2014
12th floor: tenant improvement of floor 2, consisting of non-structural partition demolition, replacement, electrical and minor plumbing; maher n/a.
-
Apr 2015
4th floor: minor interior office t.i., including new conference room, open office, meeting rooms & coffee area, mep work included; maher n/a.
-
Jan 2016
16th floor tenant improvement - new offices, conference room & break room. new lighting & finishes throughout. fire life safety & sprinkler under separate permit. interconnecting stair is under separate permit. n/a maher ordinance.
-
Jul 2016
Renovation of existing lobby space, replacement of existing level 1 storefront. facade renovation 1st and 2nd floor. add rear canopy. n/a for maher.
-
Apr 2018
10th floor - suite 1020 - interior modifications of existing office space including demolition of non load bearing partitions, new non load bearing partiions new finishes, new ele/plm/lighting under sep permit maher na.
-
May 2018
Ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferred.
-
Jul 2019
Int ti - non structual demolition of existing walls, ceilings, doors and finishes, new construction of non structural int partitions, new finishes lighting plm and mechanical.
-
Jan 2020
T.i. to include new office spaces, modified open offices, mep to accomodate new layout n/a maher.
-
Apr 2022
Ste 1200: t.i. to include non-structural interior partions and new finishes. mep & fire life safety under separate finishes.
-
Sep 2022
4/f suite 475: interior demolition of non-structural elements including interior partitions, doors, finishes, ceilings, lighting and mechanical. construction of new offices, conference, and treat area. path of travel previously approved under 202010317929 and restroom per 202203311339.
-
Aug 2024
3rd fl tenant improvement construction of non load bearing walls, celings & lighting.
-
Oct 2024
11th floor: interior t.i. of existing tenent space. minor demolition and construction of new non load bearing walls. millwork, lighting and furniture.
-
Jan 2025
10th floor: t.i. improvement of existing tenant space. minor demolition and construction of new non-load bearing walls. millwork, lighting, and furniture. deferred: el, plumb, fire sprinkler, smoke detection and fire alarm system installed to be under separate permit. fully sprinkler building.
DBI holds 661 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 661. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and who designed the open space. Submit an update