115–135 Main Street
Office building
-
December 6, 1973
The 45.3-by-137.5-foot parcel (6,301.6 square feet) held a two-storey brick building, which was proposed for demolition to make a parking lot for 38 compact cars. The City Planning Commission unanimously approved, with six conditions including a two-year limit, a conditional use for a 38-car compact-car parking lot replacing the existing two-storey brick building (Resolution 7110).
-
February 5, 1976
The two-storey brick building then here was a vacant general storage warehouse whose upper loft the Fire Department had barred from any use.
-
February 5, 1976
The City Planning Commission unanimously refused to let the warehouse become an all-day garage for about 30 compact cars, finding the brick building structurally unsuited to it (Resolution 7444).
-
May 24, 1978
A two-story brick building here was recommended for landmark designation by the Landmarks Preservation Advisory Board on 24 May 1978, for its architectural quality and its association with the city's mercantile history.
-
1980s
In the mid-1980s an archaeological monitoring and data-recovery program run alongside the building's construction recovered an extensive assemblage of material discarded as landfill, dating from the early 1850s to the end of the nineteenth century.
-
Apr 1982
Demolitions.
-
1984
Known as the McCarthy Building; it was among the rated buildings of the city's Downtown Plan inventory.
-
Feb 1984
Alteration to site 8103722.
-
Apr 2006
Demolition of existing non compliant entries at restrooms, sinks, countertops, fixtures, accessories, toilet partitions, lights, and finishes. new entry doors, frames, hardware providing required clearances, new sinks/countertops, new fixtures, and accessories, new toilet partitions, lighting, & new.
-
May 2006
Enclose existing building entry w new storefront glass, remove existing planters and remodel for new finishes and fixtures. envelope t-24 mep under sep permit.
-
Aug 2007
7th floor: full floor tenant improvement including construction of new offices, 2 conference rooms, copy room, filing room, lunch/lounge and service room. mep, life safety, fire sprinkler will be under separate permit. the demolition work has been completed under another permit.
-
Apr 2008
T.i. of new office approx.12, 00 sq ft on the 14t fl including new partitions, finishes, lighting and restroom upgrade for accessibilty. electical, mechanical, and plumbing under this permit. fire sprinkler and alarm under separate permit.
-
Apr 2008
T.o for new office of approx. 12, 000 sq ft. on the 15th floor inclduing new finishes, lighting, mechanical, electrical, bathroom upgrade for accessibility. fire sprinkler and alrm under separate permits.
-
Jul 2009
18th & 20th floors. t.i. demolition of non-structural partitions, buildnew non-structural partitions. (hvac, electrical, life safety under separate permit). building fully sprinklered.
-
Sep 2010
21st & 22nd floors-t.i including non-structural interior work, new partitions, new fixtures & millwork. m.e.p, fire, life safety under seperate permit.
-
Jan 2011
Change of occupancy form b to a-3. 3rd floor upgrade restrooms for ada. tenant improvement to existing office space, construction of non-structural partitions lighting & electrical, no structural work, no new office space added. m.e.p., life safety, fire alarm & fire sprinkler under separate permit.
-
Jan 2013
Involves demolition construction of non-load bearing partitions. new celing grid, fixts, doors & millwork. new electrical & mechanical modified to reflect new layout. breakroom plumbing.
-
Jul 2015
4th floor - full floor t.i. including demolition, electrical & mechanical work. n/a maher ordinance.
-
Jul 2018
20th fl - tenant improvement to include new partitions, phone rooms, conference rooms and pantry. mep deferred. maher na.
-
Oct 2018
Ti on 15th floor including new walls, demolition, ceiling, doors. millwork.
-
Jan 2019
21st and 22nd fl. construction of new non structural partitions, acoustical grid/tile gype bd, baffle ceilings ets. non sep accessory a use space 21st fl less than 10% of overall floor meps, ls, sprinklers sep permit.
-
Nov 2019
21st fl tenant improvement including new non structural partitions, finishes, ceilings. mep fire life safety and sprinlker under sep permit.
-
Nov 2021
9/f: reuse of existing conditions, partial demolition of non-structural elements including interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical. outlets and switches. addition of new int. partitions, doors, and finishes. modification of lighting and mep to accommodate new layout.
-
May 2022
Ste 1700: interior ti demolition non structural paritions, finishes. lighting plumbing. build out non structural partitions finishes, lighting, plumbing, minor accessibility upgrades to the 17th floor restrooms. deferred mep.
-
Feb 2023
12/floor: removal of no-structural partitions, millwork & finishes, new partitions, finishes and light, minor accessibility upgrades to the restrooms. mep, life safety and sprinklers under separate permit.
-
Mar 2024
12th floor office ti to include soft demolition to remove and add new partition walls. includes replacing fixtures and finishes. mep and fire sprinkler under separte permits.
-
Jul 2024
3rd fl - removal of non-structural partitions and finishes. new partitions, finishes and lighting restroom upgrades. mep, life safety under separate permit.
-
Mar 2025
Suite #1950: t.i. on the 19th floor to include removal of non-structural partitions, new partitions, fixtures, finishes and restroom accessiblity upgrades. mechanical and electrical under seperate.
-
Nov 2025
7/f: architectural only office ti. new partitions, offices, and conference rooms. mep deferred.
DBI holds 513 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 513. 7 of them are nominal $1 street-space or sidewalk permits. 2 expired or cancelled permits are not shown.
Nearby
- 200 Main Street Same street
- 150 Spear Street Same block
- 123 Mission Street Same block
- 160 Spear Street Same block
- 180–182 Howard Street Same block
- 201 Mission Street Around the corner
- 100 Mission Street Around the corner
- 121 Spear Street Around the corner