100 Mission Street
Office building
-
1967
Built.
-
1970-1975
Matson erected this office building within the five years or so before 1975, one of several new corporate offices then going up on the South of Market waterfront blocks.
-
Mar 1988
Replace fireproofing @ floors 1 to 10.
-
Sep 2001
Expansion of grnd floor retail space to add 3, 200 sq ft. with in footprint of existingbldg.
-
Jan 2004
Complete interior build out of a new walgreens including toilet rooms, sales area, 1-hr photo.
-
May 2008
Remodel of ground fl. 2nd floor building lobby & 5th fl. elevator lobby including restrooms upgrade on gr fl, 2nd & 5th fl. selected floor, wall & ceiling finishes upgrades. new building lobby entry store front & canopy.signage security & fire sprinkler under separate permit.
-
Nov 2011
10th floor-interior tenant improvement including demolition, new partitions, doors, ceilings & finishes.
-
Nov 2011
Interior tenant improvement including demolition, new partitions, doors, ceilings, finishes. hvac, electrical, fire suppression and fire alarm under sep permit.
-
Feb 2013
4th floor tenant improvement - new partitions, doors, lighting, pantry. hvac, electrical, sprinkler & fire alarm under separate permit.
-
Feb 2013
2nd floor tenant improvement - new partitions, doors, lighting, pantry. hvac, electrical, sprinkler & fire alarm under separate permit.
-
Feb 2013
5th fl tenant improvement: new doors, partitions, lighting, pantry. hvac, electrical, sprinklers ad fire alarm under separate permit.
-
Feb 2013
3rd fl tenant improvement. new doors, partitions, lights, pantry. hvac, electrical, sprinkler, and fire alarm under separate permit.
-
Mar 2013
6th fl t.i. new partitions, doors, lighting, pantry. hvac, electrical, sprinkler, fire alarm & evacuation signs under separate permit.
-
Sep 2013
7th floor: tenant improvement including interior partitions and ceilings, adding conference rooms, it room, -mep and life safety under separate permit.
-
Dec 2014
9th floor: minor demolitoin of existing interior to accomodate office ti. new partitions, see pre-app mtg minutes for glass in lobby walls- doors/hardware, acoustic ceilings, finishes, lighting. mep and fire alarm, sprinkler under separate permit. n/a for the maher.
-
Mar 2015
Remove and replace electrical distribution equip for compliances with title 24 meter requirements. new light fixtures, furniture feeds, receptacles throughout to accommodate new layout. ref 201412224246. n/a ordinance #155-13.
-
Oct 2015
8th floor, interior ti. sprinkler and fire alarm under separate permit. n/a maher ord. # 155-13.
-
Feb 2017
Replace existing cooling tower, boiler, and boiler pump with new. reconnect new equipment to existing piping system.
-
Jul 2020
Mechanical penthouse: replacement of 2 chillers & 2 fans. maher n/a.
-
Sep 2024
Retail and office renovation to existing building. levels b, 1, 2 core, shell and interior amenities renovation. separation of north and south side of lvl 1 with 1-hr rated construction. construction of inter story feature stairs in basement to lvl 1, and lvl 1 to lvl 2. demolition existing restrooms and construct new.
-
Oct 2024
Construction of a 7, 481 sq ft restaurant addition on the existing penthouse roof of the building, including the extension and upgrade of (2) existing elevators to new fsae elevators and elevator lobbies.
-
Aug 2025
Construction of new non-structural partitions and wall finishes; installation of new flooring, ceiling, lighting, millwork, kitchen equipment; plumbing, electrical and lighting support proposed use; hvac modifications for new layout.
-
May 2026
1 & 2/fl- new interior ti partitions, doors, and interior glazing. new lighting, electrical wiring and data systems. new mechanial ductwork and equipment. new finishes. fire sprinkler and life safety systems deferred. no 3qwork.
-
Jul 2026
Tenant improvement of restaurant for levels 12 and 13 of an existing high rise.
-
October 9, 2026
This rooftop restaurant is part of a bold bet on downtown San Francisco’s future — San Francisco Chronicle
DBI holds 256 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 256. 11 of them are nominal $1 street-space or sidewalk permits. 2 expired or cancelled permits are not shown. The assessor's roll dates the building to 1967; the 1975 environmental report has Matson erecting it within roughly five years of that report. The environmental report files this address under assessor's block 3710; the address resolves to block 3712.