37.7919, −122.3938 A locator map appears here once a Mapbox token is configured.
Know This Place

District 6 · Block 3717, Lot 002 · ZIP 94105

124–128 Spear Street

Office building · East Cut

  • 4 stories
  • 25,208 ft2
  • 6,301.63 ft2 lot area
  • 29 rooms
  • 8 bathrooms
  • Zoned C3O
  • Sold August 30, 1995
Land$1,661,276
Improvements$1,478,535
Total assessed$3,139,811
37.7919, −122.3938 Street View appears here once a Google Maps embed key is configured.
  1. 1918

    Built by W. C. Duncan & Co..

  2. March 27, 1918

    A building contract was recorded for a four-storey and basement warehouse of mill construction with brick walls, all work, at $38,305. W. H. Ratcliff Jr. was named as architect and W. C. Duncan & Co. as contractors.

    Building and Engineering News, San Francisco Public Library (Internet Archive)
  3. Oct 1985
    Permit 8511131 $$$ $50,000

    Underpin rear of building.

  4. Sep 1989
    Permit 8916068 $$$ $18,000

    Int grnd floor rmdl, new crpt, paint, new 1-hr demisg wall.

  5. Sep 1989
    Permit 8916454 $$$ $25,000

    New floor wall, ceiling finishes.

  6. May 1990
    Permit 9008482 $$$ $7,000

    Install new counter and deli cases & drink cooler.

  7. Nov 1995
    Permit 9518463 $$$ $160,000

    Comply with umb ordinances.

  8. Aug 1997
    Permit 9716195 $$$ $15,000

    Install wall store front.

  9. Jul 2003
    Permit 200307179683 $$$ $8,000

    Installation of a 1 hour fire rated partition to enclose abandoned inter. connecting tenant stair.

  10. Oct 2011
    Permit 201110267663 $$$ $6,700

    Sidewalk replacement.

  11. Sep 2012
    Issued Permit 201209240492 $$$ $250,000

    1st and mezz floor. ti - demolition of non-structural partitions and building non-structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design build and submitted separately. building is not fully sprinklered.

  12. Nov 2014
    Permit 201411262630 $$$ $35,000

    Reroofing.

  13. Feb 2016
    Permit 201602260625 $$$ $360,000

    3rd floor: ti to include demolition of non structural partitions and new non-structural partitions. all new or revised mep and life safety/sprinklers will be design build & submitted sep. - bld fully sprinklered. compliance with maher ordinance no 155-13 not required.

  14. Apr 2016
    Permit 201604084284 $$$ $40,000

    Title 24 electrical to add new lighting and power for t.i permit application 201602260625 on 3/f. n/a ordinance #155-13.

  15. Apr 2016
    Permit 201604154945 $$$ $42,000

    3rd floor: t-24 mechanical to install new equipment. ref app#201602260625. n/a for maher.

  16. Oct 2020
    Issued Permit 202010156592 $$$ $8,500

    Upgrade existing building entry per ccsf accessible business entry program. install in floor power door oerators and door actuators as local equivalency for door opening pressure and level landing. sidewalk was replaced in 2012 under permit application 201110267663 request exemption of sidewalk upgrade.

  17. Feb 2022
    Permit 202202117860 $$$ $2,000

    Title 24 compliance. lighting fixtures replacement.sep electrical permit if required.

  18. Feb 2022
    Permit 202202117857 $$$ $6,000

    Demolition of abandoned interior stair - 134 sq ft.

  19. Mar 2026
    Permit 202603137501 $$$ $296,365

    Tear off old roofing to original roof deck. install new 3-ply modified roof system. install new metal edge flashings, pipe flue jacks, wall flashings and outlets. cool star ultra. torch down.

DBI holds 41 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 41. 2 of them are nominal $1 street-space or sidewalk permits. 7 expired or cancelled permits are not shown.

Nearby