Permit history
-
Jul 1984
Revision to 8108281s shoring.
-
Apr 1986
Install hvac, electric, temperature controls, ceilings.
-
Feb 2009
Ground floor lobby improvement of an existing building. new non-load bearing partition, ceiling & finishes. new mechanical, electrical & plumbing as required. fire sprinkler & life safety under separate permit. new canopy at mission st.
-
Jul 2010
Office ti on the 22nd fl. incl. new partitions, ceilings, lighting, finishes, electrical & hvac. no exterior or struc work, ls and sprunklerss under separate permit.
-
Jul 2010
Office ti on the 23rd fl. incl. new partitions, ceiling, lighting, finishes, electrical and hvac. no exterior or struc. work. ls and sprinkler under separate permit. ol established...assembly permit required.
-
Jul 2010
Office ti on the 21st floor including new partitions, ceiling, lighting, finishes, electrical and hvac. no exterior or structural work. la and fire sprinklers under separate permit.
-
Jul 2010
19th floor tenant improvement of existing offic espace including new partitions, ceiling, lighting, finishes, electrical & hvac. no exterior for structural work. ls & sprinkler under separate permit.
-
Jul 2010
20th floor tenant improvement of existing office space including new partitoin, ceiling, lighting, finishes, electrical & hvac. no exterior or structural work, ls & sprinklers under separate permit.
-
Mar 2011
T.i. of existing office including new partitions, ceiling lighting finishes, electrical & hvac.
-
Mar 2011
Floor 14 t.i. of existing office including new partitions, ceiling, lighting, finishes electrical & hvac.
-
Mar 2011
Tenant improvement of existing office, including new partition, ceilings, lighting, finishe electrical & hvac.
-
Jul 2011
Demolition of existing tenant improvements to include paritions, electrical data at ceiling assemblies, minor mechanical, minimal plumb, all interior finishes. new build out shall include new partitions, doors, glazing, interior finishes. mechanical and electrical with monor millwork/plumbing.
-
Mar 2012
11th floor: new ti with mep on the 11th floor to demolition and construct new non-load bearing patitions, doors, finishes and equipment.
-
Apr 2014
Tenant improvement to include non rated, non structural interior partitions, suspended acoustical ceilings system and pantry case mep&fire like safety under seperate work permit. maher 155-13 not required.
-
Feb 2015
Lobby remodel including new glass window wall & plaza remodel. n/a for the maher ordinance.
-
May 2015
17th floor: t.i. including demolition, new partitions, doors, sidelights, lighting, power finishes and associated mep. fire and ls under seperate permit. n/a for the maher ordinance.
-
Jun 2016
14th floor tenant improvement to construct new partition doors, millwork, finishes ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit.
-
Jun 2016
12th floor tenant improvement to construct new partition, doors, millwork, finishes, ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit.
-
Jul 2016
Tenant improvement on 15th floor to construct new partitions, doors, ceiling, millwork, finishes. mep. life safety/sprinklers pulled under separate permit.
-
Mar 2017
Non structural construction and toilet upgrades to comply with current ada mep, life safety, fire sprinkler under separate permit.
-
Dec 2017
18th floor only: interior ti of warm shell space, construction to include new partitions, finishes, lighting and equipment. mep. maher na.
-
Jan 2018
4th floor: new non-structural partitions for office, conference rooms, etc, and finishes per attached drawing set of previously demolished floor. clean existing restrooms. n/a maher.
-
Jan 2018
5th floor: new non-structural partitions for office, conference rooms, etc, and finishes per attached drawing set of previously demolished floor. clean existing restrooms. n/a maher.
-
Nov 2018
Suite 800: selective demolition & construction of non-load bearing partitions, new ceilings grid & tile & open ceiling, new light fixtures & new switching, new office doors & frames, salvage & reuse of existing materials if practicable, new millwork & new sink & new building standard finishes.
-
Dec 2018
Renovation/remodel of lobby & plaza, expanding ground level retail into arcade & addition of retail portico in plaza, scope incudes selective demolition, new storefronts, entry doors & exterior, interior finishes & signage, mep, fire sprinkler deferred.**comply with maher, route to dph**.
DBI holds 355 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 355. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and who designed the open space. The assessor records 1987 (on file), but Wikipedia and the SPUR POPOS guide both record 1986 as the completion year. Submit an update