150 Spear Street
South Beach · San Francisco, CA 94105
Permit history
-
Jul 1981
Additions alterations or repairs.
-
Jan 1992
Lobby remodel.
-
Dec 2005
Oti-1 3rd floor el me ls sp.
-
Feb 2006
Oti-1 4th/fl-el, me, ls, sp.
-
Feb 2006
Oti-1, 6th/fl-el, me, ls, sp.
-
Jul 2008
Modify ex. ac system for new office floor plan. ref. permit application 2008/06/20/4971 + tital 24 compliance. life safety under seperate permit.
-
Feb 2011
Tenant improvement installation of new non-structural partition offices, minor changes in bathroom, cabinets work, in bathroom, cabinet work, minor mechanical work.
-
Nov 2011
Demolition of non load bearing partitions. new non load bearing partitions, new millwork, finishes, light fixtures. mep under separate permit.
-
Jan 2012
13th floor t.i. includes selective demolition of non-load bearing partitions, construction of non-load bearing partitions, new power & data, modifications to existing ceiling & lighting, millwork & finishes. mechanical, electrical & plumbing under a separate permit.
-
Jan 2014
Replace 1 cooling tower at roof of building.
-
Nov 2017
5th floor: t.i. to demolition partitions and doors and build new partitions, glazing, doors and upgrade restrooms. n/a for maher.
-
Feb 2018
18th fl ste 1850 - demolition of non-structural partitions, ceiling grid and tile. construct new non-structural partitions, new grid & tile, doors and frames, new millwork and light fixtures, mep/fire under separate permits.
-
Mar 2018
Tenant improvement. rma of northern california. mep included. proposed use - health service.
-
Jun 2018
Lobby - facade remodel at ground level lobby entry and building. lobby remodel (installation of (2) building. address, signs under separte permits) n/a maher.
-
Apr 2019
13/f: demolition & construction of non-structural partitions, new partitions, new ceiling grid & tile, new light fixtures, office doors & frames, new millwork and finishes. mep, sprinklers, fire alarm under separate permit.
-
Jun 2019
10th floor. new tenant improvement incl new interior portions, doors, plumbing, electrical, finishes and lighting. demolition throughout. mep and fire life safety under separate permit.
-
Jul 2019
16th fl - selective demolition and construction of non-structural partitions; new ceiling grid and tile, new light fixtures, doors and frames, millwork and finishes. mep, sprinkler, life safety under separate permit.
-
Aug 2019
11th floor. tenant improvement at 11th fl. new interior partitions, doors, electrical, finishes, lighting mep def.
-
Feb 2020
7/f: selective demolition and construction of non load bearing partitions, new ceiling grid and tile. light fixtures, doors, frames, millwork, new finishes. includes bathroom upgrades and lobby finishes. mep, sprinkler and life-safety under sep permit. maher n/a.
-
Oct 2020
Mechanical penthouse: cooling tower replacment. new sand filter, ew piping to serve cooling tower. 1 new heat exhanger. power for mechanical. maher n/a.
-
Jan 2024
Interior ti demolition existing suite, light fixtures, doors and other elements being reused. new hvac design, new gas lines, to new med gas and cryo. addition of 1 new restroom, 3 collection rooms, adrology lab, breakroom. new lighting and power. 5th floor framing and anchorage.
-
Jan 2024
5th fl, suite #500 (phase 2)- demolition exsisting suite. new expansion of embryology lab, new medical gas lines, added pacu, new exam room, enlarged waiting room & radiation protection of exam room. new hvac electrical & plumbing.
-
Jun 2026
Ste: 1200 - modification to existing ti. to include selective demolition+ construction of non load bearing partitions, new ceiling grid+ tile, new light fixtures+ switching, new break area + coffee bar millwork, new finishes new door frames. deferred mep.
-
Aug 2026
12th floor: electrical under 202606032405. provide new lighting, power, signal and branch circuitng to existing panel.
DBI holds 619 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 619. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update