201 Mission Street
East Cut · San Francisco, CA 94105
Permit history
-
Dec 1977
New construction.
-
Sep 1979
New construction.
-
Mar 1982
Building use: offices.
-
Jul 1982
Additions alterations or repairs.
-
Jun 1995
Cti-1 3rd floor el me sp.
-
Sep 2006
Demolish existing finishes, communicating stair, portion of storefront, selected lighting, etc. build back new finishes, portion of storefront, sanitary facilities, water features, sidewalk, lighting. re-work hvac, lifesafety, fire sprinklers as required. scope of work limited to basemnt, 1st & 2nd floor.
-
Jul 2008
21st floor: selective demolition of existing office space. tenant improvement +/- 10, 000 sq ft elevator lobby and common corridor, restroom + drinking fountain accessibility upgrades. fire sprinkler/fire protectio systems under separate permit.
-
May 2011
Roof and basement work. replace cooling towers on roof. 3 new cooling towers. work to be done in three phases. structural work, mechanical and electrical. some work to be done in basement.
-
Jun 2012
T.i.- 12/fl: new/reloc lighting&basic electrical. hvac: 35 new supplys. 27 new interior return airgrills, vav boxes, 2-5 ion ac unit with thermostat. plumbing: drinking fountain, plumbing. restroom: 2 new ada toilets, cosmetic renovates new finishes thruout. sprinklers and fire alarm.
-
Feb 2014
Interior renovation of 4th fl, office building including non load bearing partitons, doors, ceilings, plumbing, lights, finishes, mechanical distribution work as demonstrated on plans. ada upgrades to restrooms.
-
Sep 2015
6th floor: build out - demolition non structural existing walls & construction of new wall and glazing configuration, minor ceiling and power/data work and finishes. maher na.
-
Feb 2016
24/f: project consists of a tenant improvement on one full floor, build-out consists of demolition of existing walls and ceiling, construction of new walls & glazing configuration, new power & data, new ceiling & lighting, new millwork, new plumbing & new minor structural; maher n/a.
-
Feb 2016
25/f: project consists of tenant improvement on one full floor, build-out consists of demolition of existing walls and ceiling, construction of new walls & glazing configuration, new power & data, new ceiling & lighting, new millwork, new plumbing & new minor structural; maher n/a.
-
Aug 2016
17th floor - consists of a t.i. on a single tenant floor. build-out consists of demolition of existing walls & glazing & ceiling & construction of new walls & glazing configuration, new ceiling & power/data work, & finishes. sprinklers & life safety udner separate permits. n/a maher ordinance.
-
Sep 2016
Basement: demolition & replace 2 existingcentrifugal chillers & install (2)new variable centrifugal chillers in basement mechanical room to serve building chilled water system; install new vfd's on new chilled water pumps, condenser water pumps, replace chilled wtaer & condenser water main riser.
-
Mar 2017
3rd floor - full floor tenant improvement to include non-bearing partitions, ceilings & finishes. mep under separate permit.
-
Aug 2017
Demolition and replace existing chill water risers and associated piping serving floor by floor ahus and fcs as shown, from basement to level 31 penthouse. maher na.
-
Jan 2018
Tenant improvement to consist of new non load bearing partitions door frames, interior glazing, finishes and millwork. mep & life safety under separate permit.
-
Sep 2018
16th floor - construction of full height partitions, partial height partitions doors, frames, and interior glazing, restroom upgrades, finishes. millwork, ceiling grids, mep included maher na.
-
Sep 2018
26th fl.: non structural demolition new non-structural partitions doors, glazing, ceiling, lights, millork, finishes, no change in occupancy, use or area.
-
Dec 2018
Demolition & replace tenant condenser water supply and return risers form the mechanical penthouse down to floor l2 of th ebuilding (28 stories). maher na.
-
Oct 2020
Suite 900. t.i. demolition portions of existing walls (non-structural) & existing idf room, new finishes and millwork. construct new non-structural walls. sprinkler, life safety mods under separate permit.
-
May 2024
Office ti - to 9 elevator hoistway from basement to underside of l2 demolition of partitions and concrete deck at ground floor to extend elevator hoistway to basement for elevator sevice to. new fire rated partitions to continue hoistway protection for fire and smoke separation. new structural pads and.
-
Apr 2025
Floor 1, remodel main entry portal, remodal of escalator, remove int water feature, new reception/security counter, remodel elev lobbies, floor wall and ceiling finish updates, lighting replacement and addition throughout, no change to back of house, int demolition of prior retail space with new work for.
DBI holds 935 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 935. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and who designed the open space. Submit an update