Permit history
-
Feb 1988
General const., ti space a-4, 1st floor.
-
Jun 1991
Tenant improvement (express plan check).
-
Sep 2004
Upgrade fire life safety system to newest fire alarm system. remove existing fire alarm system once.
-
Aug 2007
Interior non structural remodel of 3 apts on the 7th fl ( 701, 703, 705), no change to mep or sprinkler/fire alarm under this permit. no exterior work.
-
Oct 2007
Remodel of existing ofice tenant space (127, 898 sq ft). office buildout of entire 3rd, 5th & 6th floors and partial 2nd and 4th floors. existing exit stairs, elevators and bathrooms to remain, sprinkler and fire alarm under separate permit. no exterior/ structural work nor increase of office space.
-
Nov 2007
4th floor: tenant improvement of existing office space - new ceiling & finish throughout floor, no structural work, mep - fire sprinklers on separate permit.
-
Dec 2007
Interior remodel of ground floor restaurant/nightclub space. new kitchen and interior finishes. upgrade restrooms. new m.e.p. and structural work. fire alarm and sprinkler under separate +.
-
Oct 2013
3/f - office t.i; mep included; fire alarm and sprinkler under separate permit.
-
Oct 2013
1/f - office t.i.; mep included; fire alarm and sprinkler under separate permit.
-
Nov 2013
4th floor: interior t.i. for existing office space, including horiz. exits. mep included. fire alarm, standpipe(s), sprinkler under seperate permits.
-
Jun 2016
Tenant improvement to include new partitions with glazing configuration, ceiling and power data work and finishes. minimal structural work for new moveable partition and guardrail at e balcony. suite is currently unoccupied. life safety and sprinkler system modificiation to be under separate permit.
-
Nov 2017
Amep. level 3, office - kitchen dishroom & servery, seating areas. grease trap on level 2 & shafts that run from level 3 to roof. mep included. new 2 hrs shaft, fire assembly area- two way communication, ul 300, sprinklers and fire alarm separate permit.
-
Nov 2017
4/f- partial floor t.i. includes wellness center & 2 hr. rated enclosure of stairs that will be under seperate permit. mep. included. n/a ordinance #155-13.
-
Nov 2017
5th floor: level 5: coffee barista, counter, general seating. level 2 catering pantry. mep included. n/a for maher.
-
Nov 2017
On 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a **.
-
Nov 2017
5th fl - tenant improvement including build out of workstations, partitions a/meps. also work on 3rd floor mdf room. fire under separate permits. maher na.
-
Dec 2017
6th floor office ti with mep. new partitions, horizontal exit & finishes. this permit is to be completed together with permit #9.
-
Dec 2017
3rd floor office ti with mep. new partitions, horizontal exit & finishes.
-
Dec 2017
2nd floor: office space including partition, event rooms & horizontal exit. maher n/a.
-
Jan 2018
2nd floor: mep to support approved arch. new lighting, controls, duct work & fsd. ref 201712126227 maher na.
-
Mar 2018
6th floor - a-3 event space with associated pantry. new equipment on roof. maher na.
-
Jul 2018
Fire alrm scope of work is to modify the fire alarm field devices layout at proposed tenant improvement projects consist of the interior renovation at floors 2 thru 6 only for use by google. **maher n/a**.
-
Dec 2019
Suite 250: selective demolition of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permit.
-
Feb 2022
4/f: construction of new non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. structural drawings and calcs included.
-
Feb 2026
Ground floor - suite b14: tenant interior improvement for new bank office space including office spaces, storage rooms, staff break area and new single-user restroom. all fire protection and alarm systems devices to remain. electrical, plumbing, lighting, mechanical and life safety work performed on.
DBI holds 447 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 447. 17 of them are nominal $1 street-space or sidewalk permits.
Refregier's murals
Anton Refregier won a federal competition in 1941 to paint the lobby of the Rincon Annex post office and was paid $26,000 for 27 panels on the history of California and San Francisco. The Second World War interrupted the work; he resumed in 1946 and finished in 1948. In 1953 a congressional hearing considered removing the murals as inconsistent with American ideals and principles. They stayed.
The Rincon Annex was listed on the National Register in 1979 and made a San Francisco landmark in 1980. Doug Hollis's Rain Column, installed with the 1988 redevelopment, drops water 85 feet from a ring beneath the atrium skylight.