161–169 Steuart Street
South Beach · San Francisco, CA 94105
-
1926
The Embarcadero YMCA was completed here in 1926 between Mission and Howard, with a gymnasium and rooms for rent upstairs; named as potentially eligible for landmark designation.
-
Nov 1988
Revovate hotel, replace with 4 story building.
-
Dec 2000
Street space.
-
Jan 2001
Street space.
-
May 2001
Sign permit- non-electric, wall, projecting, single faced.
-
Mar 2004
T.i.for ymca office to include bsmt tp 3/f as well as linen chute, exterior awning, new lighting, hvac.
-
May 2004
Demolition associated per app #200403158595 basement through 3rd floor.
-
May 2004
Provide tenant fire protection, sprinkler system for the building.bsmt, 1st, 2nd & 3rd floor.
-
Aug 2004
Rev.appl#200403158595 in se corner of 1/f, change floor plan due to discover of concrete sheer wall.
-
Sep 2006
Limited demolition existing operabale partition &new door openings, build back of full ht. partitions.hvac, electrical & lighting along with fire/life safety.
-
Jan 2007
Locker room upgrades 2 & 4 floors.
-
Apr 2013
Install booster pump, install ozone system for swimming pool.
-
Jul 2013
Replace cooling tower in kind in same location, same weight and same connection.
-
Oct 2014
Barrier removal. replace e entry doors and glazing (comply to mahner ordinance - extended ordinance 155-13 not required).
-
May 2015
Remove and reinstall existing bay windows at 2nd floor pool. repair structural steel at bay windows. all work on steuart street side of building and is to be performed from interior. n/a for maher.
-
May 2015
Building facade remediation: window repair & repainting, terra cotta & brick. spall & crack repairs. concrete spall & crack repair. new wall coating & repainting, deck coating replacementat roofs, clay tile roof repair, & flag pole repair. maher ord n/a.
-
Dec 2015
Replace existing storefront at 1st floor restaurant only. no structural work.
-
May 2017
Exterior repairs of deterioration at facade including windows, terra cotta, brick, concrete, metal, deck & roof coating, clay tile and adding structural steel plate to bay window posts and replace metal studs either side of bay windows.
-
Oct 2017
3/f: demolition walls, remove column cladding. relocate drinking fountains.
-
Dec 2017
Partial ti of 3rd fl fitness area, upgrade of accessible restrooms, new ceiling, light fixtures, new flooring and paint maher not req, fire under separate permits.
-
Apr 2018
Add: 13 ceiling horn/strobes, 3 ceiling strobes, 1 booster power supply with sync module, 1 smk det above booster maher na ref permit application 201803264555.
-
May 2018
Fire sprinkler ti to 3rd fl. ref arch #201712126185. maher na.
-
Feb 2021
Barrier removal consists of new inclined lift at existing exterior stair alcove. structural connection to existing stair treads. new electrical for inclined lift motor is deferred submittal. partial lift run and lower landing at san francisco port sidewalk at embarcadero.
-
Sep 2021
Interior renovation of portions of the existing 1st fl, 2nd fl, 3rd fl and 4th floor of the embarcadero ymca including removal and additions of interior partitions, floor finish, doors, light fixtures, controls, power and data, plumbing fixtures and toilet accessories, cabinetry and paint at.
-
Jan 2026
Verizon wireless tua: temp wireless facility to install 9 antennas; (1) mw dish; 3 rrus' 200a electrical service; conduits; batteries.
DBI holds 63 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 63. 12 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the year the building went up, the architect and builder, the early tenants and the date of the last recorded sale. Submit an update