177 Steuart Street
South Beach · San Francisco, CA 94105
Permit history
-
Jan 1984
New construction.
-
Apr 2015
Interior renovations to 3rd fl including arch, mep. demolition completed under 201502037319. fire sprinklers & alarm under separate permit. compliance with maher ordinance no 155-13 not required.
-
Apr 2015
Interior renovations to 5th fl including new arch mep work. demolition completed under 201502037319.
-
May 2015
Alterations to existing 8 story building. work includes new mep upgrades, roof screen & mechanical platform.2nd floor: work includes computer lab, idf & electrical rm & bathrm upgrades.lower level work to remove 8 parking spaces for future mep upgrades.upgrade 9e)mechanical shfat @stair #1 &addnewvent shaft @roof; maher n/a.
-
Jun 2015
Tenant improvment to 8th fl, upgrades to restrooms maher not req. ceiling trellis and updated fire sprinklers under deferred separate permits.
-
Sep 2015
2nd floor: ti - addition of conference rooms and open office seating. mep & electrical included. maher na.
-
Sep 2015
Replacement of the waterproofing membrane @ the floors with balconies (5, 6, 7, 8), as well as some ada upgrades to the guardrail. demolition sliding doors and replace with ada complaint. demolition balcony plantar and replace with non-mobile plantar. maher na.
-
Nov 2015
Interior alterations to floor 6. renovations include dining, food prep and meeting areas that are an accessory use. maher not req. life safety/type 1 hood deferred submittals.
-
Jun 2016
Work at basement, floor 1, and roof. basement: modify partition walls. install new generator and fuel oil system. ref app#201505126148. roof structural modification to existing equipment. floor 1: add mechanical box to existing column and provide 2 hour partition at existing mechanical shaft. ** maher: n/a **.
-
Jun 2016
Basement & roof- m.e.p. work - new lighting fixtures, controls, power & signal outlets for central plant upgrades, replace existing mechanical equipment. ref permit application 201505126148. n/a meher ordinance.
-
Jun 2016
Interior alterations including walls, ceilings, flooring and casework. mechanical, electrical, plumbing to support new interior space. demolition under 201602119345 maher not req.
-
Dec 2016
#420 - interior alterations including walls, coilings, flooring and casework. mechanical, electrical and plumbing work to support new interior space, demolition and safe off per the demolition drawings. ref. sprinkler permit app#2016-1202-4076. n/a ordinance #155-13.
-
Feb 2020
4th floor: new office space, meeting rooms, lounge spaces, and break room. new interior partitions, doors, finishes, ceiling, lighting, mechanical, electrical outlets & switches.
-
May 2021
Voluntary seismic upgrade to an existing 8-story concrete office building with a basement parking garage. structural improvements include installing concrete shear walls, collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)column.
-
Aug 2021
3/f & 5/f: voluntary structural strengthening.
-
Jul 2022
7th fl: modification of existing ti including the construction of non-load bearing partitions, new office doors & frames, new ceilings, and light fixtures, new power & data receptacles, new millwork & finishes.
-
Jul 2022
8/fl: ti including the construction of non load bearing partitionsnew office doors and door frames. new ceiling and light fixtures new power and data receptacles, new millwork finishes. ref permit application 201603242951.
-
Jul 2022
Ti on floor 2: new non load bearing partition doors, frames, ceilings, light fistures, power/data receptacles, millwork, finishes.
-
Jul 2022
Tenant improvement on fl 5: new non-load bearing partitions, doors and frames, ceilings and light fixtures, power/data receptacles, millwork finshes. fire alarm/sprinkler under sep permits.
-
Dec 2022
3/floor: ti modifications to non-load bearing partitions, new doors, glazing & door frames, n ceilings & light fixtures, n power & data receptacles, n millwork & finishes. mep & life safety deferred.
-
Dec 2022
1st/floor & basement: ti modification to create an enclosed 1st floor elevator lobby. construction of non-load bearing partition, n doors, glazing, door frame, ceilings, light fixtures, reception desk, power & data receptacles. bsmt lvl only involves mod to e elevators lobby door. mep & life safety def.
-
Sep 2024
Reroofing.
-
Nov 2025
Ground fl: ti for event space. scope consists of selective demolition and construction of finishes, non bearing partitions, lights, doors, frames and hardware.
-
May 2026
Removal of e and installation of new mechanical chiller, associated mechanical equip and modification to the raised grated steel platform and stairs. stuctural mechanical and electrical included.
DBI holds 264 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 264. 11 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update