64 Townsend Street
South Beach · San Francisco, CA 94107
Permit history
-
May 1999
Parapet bracing.
-
Jun 2000
Street space.
-
Jul 2000
Seismic upgrade unreinforce masonry building instal basic new el mechanical pl & f/protsym provisions for othe.
-
Aug 2000
Soft demolition prepare site for seismic upgrade.
-
Mar 2001
Revise to appln #200007074541s2: structural.
-
Aug 2003
Shoring, underpinning & tiebacks for project at 699, 2nd street.
-
Sep 2008
Renovation of retail shell, including new storefront, new partitions, new doors, 4 new restrooms, new non-structural floor slab. mep/fire under seperate permit. create 2 retail tenant spaces.
-
Mar 2009
Vacant space: modify existing fire sprinklers to accomodate new tenant improvements (15 heads). ref. appl.#2008/0908/0976.
-
Sep 2011
Remove & replace raised area concrete floor slab on grade to level floor.
-
Jan 2012
1st & 2nd floors-t.i. of existing retail shell space, connecting 64 & 66 townsend street with new wall opening & accessible sloped surface. addition of interior non structural partitions, new floor coverings, 1 accessible shower for employess only. all lighting & hvac system to remain. for change of use.
-
Mar 2012
Modify existing sprinkler system for t.i. add 4 heads. at ground floor- changing space to light hazard design.
-
Mar 2012
Add notification in 64/66 townsend st due to tenant improvement. replace existing devices 64-72 townsend block 3789/972-973-974.
-
Aug 2012
Revision to appl 2012.01.12.2112. to change of egress path.
-
Oct 2013
Relocation & removal of fire alarm devices, including relocating the fire alatm panel, in area affected by demolition in permit application 200705010136. fire alarm for new building to be under seperate permit.
-
Jan 2014
Tower crane erection for new construction under application #200705010136. compliance with ordinance #155-13 not required.
-
Mar 2014
Revision to appl #2012.01.12.2112: modifications of 2 existing locker rooms. demolition wall to join two bathrooms, replace sinks, new toilet partitions, & new showers in each locker room. compliance with ordinance #155-13 not required.
-
Jul 2019
Demolition of non-structural partitions, restrooms and showers, light fixtures and finishes. construction of new non-structural partitions, restrooms, light fixtures, millwork and finishes.
-
Sep 2019
A design build ti to an existing gamewell/fci (e3) system. fdu will provide safe off prior to demolition by others. new audible & visual occupant notification devices throughout common areas per code. 201907226469.
-
Oct 2019
Add and relocate sprinklers in area of work to accomodate new tenant improvement. area of work consists of office space classified as light hazard occupancy per nfpa 13 - relocating and adding a total of 22 heads.
-
Oct 2019
Installation of duct work and exhaust fan on roof. in-wall rough-in.
4 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update