275 10th Street
South Of Market · San Francisco, CA 94103
Permit history
-
Nov 1990
Front 50' of building to be parapet reinforced.
-
Jan 2001
Seismic retrofitting and related accessibility remodeling.
-
May 2006
Erect 5 stories, 135 dwelling units, with office, garage, no basement building.
-
Nov 2006
Demolish 2 stories, warehouse building.
-
Aug 2007
Provide temp. shoring at the dore st. sidewalk and for eartchwork and concrete footing. demolition under sep. permit applic. #2006-11-03-6839. ref. 2006/05/15/1589 note: pre-merge lots #17, 29, 14.
-
Mar 2008
Installation of a new fire alarm system to building. initiating devices tied into new mxl-iq plus-12a fa control panel. all audible/visual circuits tied into pad-3 auxillary power supply located in electrical room and activated by a signal circuit from the mxl-iq plus-12a facp.
-
Jul 2008
Verify and assign additional address.
-
Aug 2008
Revision to addendum #3 permit application 2006-0515-1589, s-3/r-1; adding window sprinklers (10).
-
Aug 2008
Revision to appl #200605151589: lobby storefront (interior) changed from 45 min glazing with 20 min doors to non-rated glazing protected by tyco ws deluge sprinklers on both sides. storefront exit from courtyard revised from 45 min rated to non-rated because perpendicular to proeprty line.
-
Oct 2008
Add one sprinkler head in canopy & 2 window sprinkler heads at outside of building egress. ref. #200808068552.
-
Apr 2009
Revision to appl #200605151589 - removel roll down door & add delugen sprinkler heads at entry, add 2 hour ceiling at exit enclosure, remove exit sign at overhead canopy, add new pocket door between offices 122 & 123.
-
May 2010
Two units-remove & replace water damaged dry wall, replace water damaged insulation in 2 units. no new walls to be added.
-
Sep 2021
1/f: t.i. of office: provide new mechanical, electrical and plumgin infrasture. provide new fully accessible restrooms, staff breakroom, meeting rooms and ramp.
-
Dec 2021
T.i. to 1st fl office only. ref to 202109289299. add 15 pendent sprinklers and 5 upright sprinklers. relocation 1 upgright to suit tenant improvement.
-
Jan 2022
Fire only work for the "ecs bishop swing" office remodel on floor 1; additions are 1 strobe power supply, 9 speaker/strobes, and strobes. ref permit 202109289299.
-
Nov 2023
Fire only work "verify existing sound levels in sleeping areas, complying with sffc section 1103.7.6.1" no ref #.
-
Jul 2025
Water damaged repair to windows on 5th, 4th and 3rd floor. replace sheetrock at walls and ceiling. replace falshing, waterproof windows, repair 15sf of stucco. reinstall existing windows. work to be at courtyard.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Submit an update