1215–1285 4th Street
193-unit apartment building
-
Jul 2006
To erect 192 dwelling units/storage/prking/retail (8 stories).
-
Jan 2007
Grading per plan. (ref. to appl#200607247440).
-
Aug 2007
Erection, operation and dismantle of tower crane located on job site.
-
2009
Built.
-
Dec 2009
Work on hallway @ three units on 1st floor - replace water damaged - sheetrock at bottom 12" of wall. replace 12" insulation, repalce baseboards, replace carpet & paint. no electrical, no plumbing.
-
Sep 2013
Ground floor one unit: t.i. first time build out, includes demolition of one store front entry and build back non structural partitions. all new or revised hvac electrical, plmg, and life safety work will be design build and submitted seperately. building fully sprinklered.
-
Nov 2013
One unit: install two new fan coils & condensers with new grilles, new thermostats, refrigerant piping & duct work, install bath exhaust fan with duct & exhaust louver, instlal outside air duct from new outside air louver to two fan coil return plenums.
-
Jul 2014
Demolition of most existing exterior finishes materials along west elevation as well as select portions of north and south elevations of building due to damages from a fire at the under contruction project located across 4th street. replacement in-kind under separate permit.
-
Nov 2014
Repair/replacement of most existing exterior materials along the west elevation of the building as well as select nearby portions of the north & south elevations.these areas were exposed to heat and damaged on 3-11-14 during a fire at under construction mega blocks 360 apartments (mb360) project; to.
-
Dec 2016
Ground floor: ti- new partitions, ceiling, lighting, power mechanical & plumbing. new finishes on walls and floor.
-
Feb 2017
New fully accesable toilet room, new rear exit door, new mechanical heating and cooling system electrical service to space and panel for commercial space.
-
Jan 2018
1st time tenant improvement - ups store - all interior work- new cabientry & finishes, new mechanical, electrical work, ada restroom to be completed, new ceiling, new attic storage.
-
Feb 2019
Existing leasing office to have unisex restroom ada upgrade with finish/fixture. residential lobby finishes and lighting upgrades for all spaces 1/fl, 2/fl residental & 3/fl common area.
-
May 2019
Ti of 1st fl medical office: non structural partitons, ceilings, casework, casework finishes, mep work. exterior signage for ref only. exterior signage will be under sep permit, maher n/a.
-
Sep 2019
Fire sprinklers: relocate 39 pendents on the ground fl. ref ti #201905130399.
-
Oct 2020
Rev to pa201805240066: new canopy at residential entry door from city sidewalk.
-
Sep 2021
Direct replacement of 2 existing rooftop non condensing boilers with 2 new condensing boilers.
-
Dec 2021
1st floor - 1st time tenant, cfc req, new food service, tenant finish out from existing space. existing storefront and entry door to remian. minor store front modification for new louvers.
-
Feb 2022
1st floor: installation of new transformer and replace of rough plumbing connections at existing concrete slab.
-
Feb 2023
Tenant improvement. adding children's restroom and kitchenette. establishing e occupancy in vacant retail suite. mep deferred.
-
Jun 2023
Deferred mep for permit 202302131874.
-
Sep 2024
Install new fire alarm system in 1245 4th st to tie into an existing system at 855 mission rock. install new facu, aes com, amp, smoke detectors, manual pulls, monitor modules, speak strobes, and strobes. install relay modules to backup to existing main system when the main system goes into non-normal conditi.
DBI holds 80 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 80. 15 of them are nominal $1 street-space or sidewalk permits. 3 expired or cancelled permits are not shown.
Nearby
- 655 Fourth Street Same street
- 506 China Basin Street Same block
- 588 Mission Bay Boulevard Same block