588 Mission Bay Boulevard
Mission Bay · San Francisco, CA 94158
-
Sep 2016
Per permit application 201404042522s, create six commercial retail addresses at block 8711, lot 006 as; 1335, 1345, 1355, 1365, 1375, 1385 4th street.
-
Nov 2016
Install a solar hot water heating system. system consists of a solar thermal collectors, a roof mounted storage tank and heat exchanger, and all associated piping and insulation.
-
Dec 2016
Revision to 201404042522 s3 to revise the draft stopping in roof. crickets combustible concealed space - includes ab-005 maher na.
-
2017
Built.
-
2018
Five88, designed by David Baker Architects.
-
Nov 2018
To comply with nov #201898971. replace previously removed insulation and fire rated drywall in three units, and common hallway. 2' flood cut.
-
Feb 2019
New interior t.i. restrooms, breakroom, teller line, doors, millwork, flooring and mep's.
-
May 2019
Ground fl - existing srpinkler system ti. relocated 36 sprinklers, added 20 sprinklers.
-
May 2019
Fire alarm ti ref 201902284052 add 1 booster panel, 1 synchronization module, 9 horn strobes, 4 strobes, 7 duct detectors, 4 control relays.
-
May 2019
Tenant improvement - fitness studio with retail: install hvac system, 2 ada bathrooms & broom closet.workout studio, lighting system, and av system. maher na.
-
Jun 2019
Ti - interior only install of new cabinetry, non-bearing walls, partitions, break room, some new floors, some ceiling, mechanical, electrical & fire protection/srpinkler work deferred and under separate permit.
-
Jul 2019
Install new 4 ton capacity heat pump system. install new ducting, connect to existing outside air duct & refrigerant lines. maher na.
-
Aug 2019
1st fl - modify existing fire alarm system. add 4 wall horn/strobes, 5 wall strobes. ref pa 2019-0610-2971.
-
Oct 2019
Lighting and t-24. ref permit application 201906102971.
-
Dec 2019
Addition of auto sliding door and floor finish upgrades at 1st fl. main entry of existing building constructed in 2015.
-
Dec 2019
This project consists of an interior, ground level tenant improvement to an existing 5 story, mixed use concrete podium building, the scope of work is a new cafe with customer service, and back of house areas no exterior work//change of use from b to a2- operational permit required.
-
Jan 2020
Modify existing fire alarm system. add 1 duct detector, 1 control relay, 4 ceiling horn strobes, 2 wall strobes.
-
Feb 2020
Fire sprinklers: relocate pendent sprinkler heads to meet new ceiling hights and walls n/a maher.
-
Jun 2020
Minor interior alteration to provide & install a demising partition to divide an existing vacant ground floor retail space 6 & create retail space 7. all ti works under separated permit. space remain unoccupaied and qualify for ab-17 accessilbity exception.
-
Dec 2020
Ti# 2019-1220-0102 modify existing fire alarm system. add (10 booster power supply, (1) sychronization output module, (1) smoke detector, (3) duct detectors, (3) control relays, (4) wall horn/strobes, (1) wall strobe.
-
Jul 2021
Reprogram existing errcs bda head end unit as well as replace the donor roof antenna to comply with sq ft frequencies. all other components remain unchanged. ref pa201511031492.
-
Jan 2022
Repairs to existing laundry room including structural repairs. replacement of damaged roofing & revisions to mechanical system.
-
Mar 2022
Ground fl-1st time new food service; ti include new food service area, casework, interior lighting; front entry door & mechanical louvers in existing storefront will be relocated. no changes to existing building footprint, area or height; no customer seating for onside food consumption. establishment sells food.
-
Jun 2022
Provide and install one 4-ton heat pump, run refridgerant lines, ductwork, grd and thermostat. ref permit application 202203199583.
-
Jun 2022
G/f: t.i.: add 4 horn/strove fire alarms - ceiling mounted to existing system. ref pa202203099583.
-
Aug 2025
Addition of showers at existing accessible bathrooms located floors 2-5 at se corner of building. floors 3-5 showers will be made accessible. scope includes structrual adjustments to existing wood shear walls to accommodate new shower entries/openings.
-
Sep 2025
Excavate and shore tunnels underneath the pile supported podium slab so that the plumbing maintrunk lines can be replaced and the branch linerepaired or replaced as required. access to the underside of the pile supported podium slab will be made through openings in the podium slab floor & exterior.
DBI holds 51 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 51. 5 of them are nominal $1 street-space or sidewalk permits. This building's context statement dates the work 2018; the assessor's roll records the parcel as built 2017.