Mar 1983
Additions alterations or repairs.
-
Aug 1992
Parapet work.
-
Sep 1996
Reroofing.
-
Feb 1997
Build partition walls move 2nd story main entrance door add.
-
Jan 2006
Demolishing office and industrial building.
-
Jan 2006
To erect 192 dwelling unit with 7 story new building/mixed use.
-
Dec 2008
Create a restaurant in vacant commercial space.
-
Dec 2008
Create a coffee shop in vacant commercial space. lighting compliance under separate permit.
-
Feb 2009
Installing lighting per title 24 energy calculations.
-
Feb 2009
Replacing glazing anddoors including door at rear: same size, in kind, same location. new windows: u<0.77.
-
Apr 2009
Creating a taqueria in vacant commercial space. new kitchen and accessible bathrooms. sprinklers under separate permit. hood and mechanical under separate permit.
-
Apr 2009
Correcting occupancy for permit appliances per app#200812027659 issued in error. occupancy should be (b) no a-2 for record keeping only.
-
Aug 2009
Installation of fire sprinkler in accordance of nfpa 13, adding (16) new sprinkler heads of existing system and changing old heads for new heads. same k factor.
-
Oct 2009
Installation of ul 300 fire supression system.
-
Apr 2011
Installation of ul 300 kitchen fire system.
-
Dec 2011
Exposing framing to install electrical wiring & replacing deteriorated framing. creating accessible bathrooms.
-
Mar 2012
Install fire sprinklers above and below mezz. using the existing sprinkler system, total 18 new heads. seismic bracing calc's.
-
May 2012
Revision to permit application 2011-1215-0704-reconfiguring 1st floor plan, adding staff kitchen & deleting 1 bathroom. electrical under separate permit, mechanical./title-24 under separate permit.
-
Aug 2012
Replacing broken store front glazing in kind 0.77 max u factor size approx 18'x10'.
-
Feb 2013
Adding canopy at rear open seating area of existing taqueria.
-
Sep 2019
Tower 1. to erect 40 stories, 3 basements, type i-a, 494 residential units with mixed used commercial. (r-2, m, a-2, a-3, s-1, s-2) ** maher: yes, route to dph **.
-
Sep 2019
Podium. 1-story, 3 basement, 0 unit. (2 towers will be on podium).**comply to maher, route to dph**.
-
Sep 2019
Tower 2. erect a 40 stories, 501 dwelling residential one unit basements building, type 1a mixed use (s-2, a-3, a-2, s-1, m, b, r-2, r-1) ** maher: disturbance of at least 50 cu.yd.of soil, route to dph **.
-
Dec 2025
Painted sign: coffee waffle.