260 Townsend Street
South Of Market · San Francisco, CA 94107
Permit history
-
Sep 1981
New construction.
-
Sep 1981
New construction.
-
May 1983
New construction.
-
Dec 1983
Computer rom alteration.
-
Mar 1985
Tenant improvement on partitions of ground floor.
-
Feb 1995
Cti-2 6/f el me sp.
-
May 2002
Oti-1, 4th floor, el, me, ls, sp.
-
May 2002
Oti-1, 3rd floor, el, me, ls, sp.
-
May 2002
Oti-1, 5th floor, el, me, ls, sp.
-
May 2002
Oti-1, 7th floor, el, me, ls, sp.
-
May 2002
Oti-1, 2nd floor, el, me, ls, sp.
-
May 2002
Oti-2, 4th floor, el, me.
-
May 2002
Renovation to 1st fl t.i consisting of ceiling, partitions, milwork, power, data, lighting & finish.
-
Jul 2002
Renovation to lobby 1st floor.
-
Jul 2004
6/f-interior office t.i. includes new partitions, doors, fixtures, finishes, lighting/mechanical under seperat.
-
Jun 2014
The project involves selective demolition, limited framing & finishes on 2nd & 3rd floors. the work stations will be reconfigurated. the meps will be design build. n/a ordinance #155-13.
-
Jun 2014
New non-structural partitions, lighting, electrical, finishes, millwork. no change in use, occupancy, area.
-
Oct 2014
7th floor: demolition of existing interior non-load bearing partitions- new non-load bearing partitions & doors, install casework new suspended ceiling system, mep, life safety & fire sprinkler under sep permit; maher n/a.
-
Mar 2016
4th floor: demolition of non-structural partitions, millwork, plumbing, electrical, gypboard ceiling and finishes. new construction consists of accustical cieling repair, plumbing, millwork, electrical and finishes. no change in lghtg and hvac. sprklr, fire life safety under seperate permit.na maher.
-
Aug 2017
6th fl: build out shell space to add two office suites industry private offices, conference rooms & breakrooms. 7th fl: upgrade restroom & fixtures & finishes. mep and life safety under spereate permit. maher na.
-
Feb 2022
Install 2 piece water cooled scroll chiller at basement level replace like for like indoor boilers at rooftop mechanical room. replace like for like cooling tower at rooftop level. includes (4) pumps (2) expansion tanks at rooftop.
-
Mar 2022
4/f: inteiror demolition of non-structural elements including but not necessary limited to partitions, doors, finishes, lhghting, mechanical&electrical outlets&switches. space shall remain vacant until future tenant buid-out.existingopening ceiling requires sprinkler mod except in suspended ceilings to remain.
-
Dec 2022
Building entry lobby work includes inter demolition lobby of decorative precast panels & nw seating area, new guard desk. structural waterproofing, t-24, etc engineering to be design-build.all mep, sprinkler, & sffd life safty system will be under seperate permit.exterior upgrades to be permitted seprt.
-
Feb 2023
Gr/f: removal of existing 3-story tall glass atrium exterior enclosure & installation on new metal panel & glass entry portal & canopy.
DBI holds 89 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 89.
Not yet documented: the architect and builder and the early tenants. Submit an update