228–248 Townsend Street
South Of Market · San Francisco, CA 94107
-
1910s
Run as the Pullman Hotel, home to a number of African American railroad porters who lived close to the Southern Pacific depot.
-
May 1983
Additions alterations or repairs.
-
Aug 1984
Install aluminum windows.
-
Jan 1985
Install 4 awinings 3 on townsend/1 on lusk.
-
Jul 1988
Reroofing.
-
Jun 2000
Replace entire roof with newframing members & new roof diaphragm, provide new unisex restroom.
-
Oct 2004
Remodel of existing commercial space (cafe).
-
Jan 2007
Revision to permit application 2004/10/26/7745. complete existing facade to match existing surrounding finishing. structural alteration to entry ways, add new shear wall. add new storefront windows & doors. add cap to open chase to roof.
-
May 2009
All work at 236 townsend: change use from gym to deli/cafe.expand bath to ada compliance, install interior ramp for ada, add 3 partition walls for office/storage.
-
Sep 2011
Conveyor equipment brace/anchorage to ceiling & floor joist in ground floor business. laundry drop off sight, change of use from retail to drop off laundry. furnishing & installing conveyor equipment under this permit.
-
Jan 2012
Create new office on third floor with new stair.
-
Mar 2012
2nd floor t.i., remodel toilet rooms to comply with ada, add elevator shaft(elevator separated permit), add corridors to existing stairs, cutt hole in existing roof for mechanical. mep under separate permits.
-
Jun 2012
2nd floor & roof-install 4 hvac mechanical equipment roof mounted.
-
Jun 2014
Remode existing grocery store and convert to a 1000 sq ft wine bar. n/a for the maher ordinance #155-13.
-
Feb 2017
T.i.: renovation of existing restaurant space. replacing the bar, installation of built-in seating, replacement of fixtures an finishes and accessibility upgrades. fire life saftey will be under sep permit.
-
Jun 2017
Install non electrical single faced sign maher na.
-
Jun 2017
Build interior partion walls, install new recessed cans, switches. n/a ordinance #155-13.
-
Aug 2017
Ti improvement, relocate toilet (ada), new stair to under floor area. new door opening on clyde st elevation.
-
Mar 2018
Revision to permit application 201708306491. add new 4x4 df#1 floor beam and concrete footing in underfloor area at stairs. maher na.
-
Jul 2018
Ada compliance at front entrance.
-
Aug 2020
Reroofing, tear off existing roof, installing a class b assembly with coolstar reflective modified bitumen app 20 year roof. new sheet metal flashing. (permit excluding rough carpentry work).
-
Oct 2023
To comply with abe abe#202208182799. install ada door opener system.
-
Jan 2024
Convert existing retail space to food service wine bar, install pre fabricated bar & top electrical circuits for water heater, dishwashers, fridge & cash register, install plumbing for 3 comp sink, hand sink, dish washer, floor sink & water heater.
-
Jun 2024
Small ti to install handsink, new compartment sink, and storage lockers for products related to beverages/food. install new power door operator at entry per ab005.
-
Jul 2025
To abate nov 202535904 to include install ceiling mounted unit cooler and condenser. install 142 new wine storage lockers at basement level dulicating lockers at 1st floor.
DBI holds 48 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 48. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update