Permit history
-
Oct 1981
Additions alterations or repairs.
-
Jul 1984
Install 8 enviromental air conditioning units &etc.
-
Jan 1987
Provide new partitions, floor covering & minor hvac/electric.
-
Feb 1987
Refurbish furniture partitions & install new floor covering.
-
Mar 1987
Provide new floor covering, refurbish, furniture partitions.
-
Nov 1991
Install generator, remov load door, instl switch, bmt-express.
-
Aug 1993
Cti i ground floor el-me-sp).
-
May 1994
Cti i floor 1st el me sp.
-
Sep 1997
Cti 2 el me ls sp 3rd floor.
-
Dec 1997
Cti-1 5/f el me sp.
-
Dec 2002
6th floor, interior tenant improvement & new partitions & data cable tray-sep permit for fire alarm &.
-
Sep 2003
Remodel of 6th floor new partitions & millwork.
-
Sep 2003
Fire alarm system upgrade, corrective plan of action is currently under review.this permit covers.
-
Aug 2004
2 chiller & 2 cooling tower replacement with anchors and equipment support.
-
Jun 2005
Upgrade facilities electrical standy power stystem equip. 5 existing diesel generators located in.
-
Aug 2007
Reroofing.
-
Jun 2011
Complete renovation of exteriior building cladding systems, interior improvements, and new fire life safety systems. structural upgrades will be required in addition to improvements to existing building, mechanical, electrical, and plumbing systems. total project size is approximately 396, 536 gsf.
-
Dec 2012
Replace all existing pipe with new in the basement. floors 1 to 5 install new sprinkler systems. total sprinklers 1820. interconnecting and converting all standpipes from dry to wet.
-
Feb 2013
Installation of new notifier fire alarm system due to building renovation, ref building permit application 2011/06/10/7882.
-
Oct 2013
2nd floor tenent improvement fo r2, 581 sq for audiology department. sprinklers, fire alarm separate permits.
-
Dec 2013
T.i. build out office and education space. compliance with ord 155-13 not required.
-
Jan 2014
6th floor tenant improvement, interior office remodel including construcito n of non-rated partitions & interior finishes, mechaical, electrical, plumbing, sprinkler & fire alarm under separate permit. compliance with ordinance #155-13 not required. excavation <50 cu.yd.
-
Jan 2014
7th floor ti, interior remodel mep anfd life safety (fa and sprinklers) shall be submitted under separate permits. compliance with ordinance #155-13 not required. excavation <50 cu.yd.
-
Jul 2025
6th fl: tenant improvement for uop audiology dept. relocating from the 1st fl to a portion of the 6th fl (10, 580 ft). includes room repurposing and internal layout modifications. shared common area to provide access for uop & future tenant. access includes restrooms, electrical room & elevators.
-
Jan 2026
1st fl ti for new clinic & ambulatory surgery center. work includes dental clinic with reception, waiting area, 4 operatories, 5 exam rooms, 1 recovery, 4 special care rooms, offices, lab & support areas. surgery center includes reception, pre/post op rooms, 6 ors, nurse stations.
DBI holds 235 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 235. 5 of them are nominal $1 street-space or sidewalk permits.