888 Howard Street
South Of Market · San Francisco, CA 94103
Permit history
-
Aug 2002
Erect a 32 story 555 units hotel.
-
Apr 2005
Excavation shoring and underpinning.
-
Apr 2006
Provide food service per plan. ref new building permit application 2002/08/15/4137s.
-
Apr 2006
Erect and operate tower cane.
-
Apr 2006
Erect and operate cane to comply with notice of violation issued on 5/16/2006.
-
Sep 2006
Provide arch. and structural details and equipments for swimming pool. ref. #200208154137 1s./occupant load calculations and path of travel on arch. addendum under app #2002081541371s.
-
Jan 2008
Install four ansul fire suppression systems in kitchen hoods. one on each floor - 1, 3, 4, 5.
-
Mar 2008
Floor 7 thru 11: revision to appl #200208154137-s4 to eliminate ws sprinklers. provide 1-hour fire rated interior wall over window assembly at light courts at 2 locations on the south building elevation. complaint #200796901.
-
Jul 2008
Fire alarm ti for meeting rm elev lobbies/back of house area on floor one thru five, 5 control relays, 29 smoke detectors, 36 door holdes.
-
Dec 2009
Install 1 heat exchanger unit at the mechanical room on the roof level.
-
Apr 2013
Add an exterior vestibule to an existing building to reduce wind & air infiltration. add planter/landscaping per discussions with city planning department.
-
Sep 2014
3rd, 4th & 5th floors fire alarm, adding door holders & smoke detectors including (13) smoke detectors, (23) door holders.
-
Mar 2015
Renovate room 3118 to remove non-structural walls, reconfigure bathroom, add a pantry/closet and replace interior finishes. minor incidental work also related to this in room 3117 and 3018. n/a for the maher.
-
Aug 2017
Removal and replacement in kind of 26% of insulating glass units. approx 1700 units (windows). appearance of building will be unchanged. no change in use, height, area or egress, or construction type occurs.
-
Mar 2018
6th fl - renovate 5950 sq ft of existing6th fl to change it from a day spa ( b occupancy) to 7 guest rooms (r-1 occupancy) mep/fire under separate permit. ** maher: n/a **.
-
Jun 2018
Installation of anchor bolts only for possible future fabric canopy, the canopy (if built) will be a seperate project under separate permit.
-
Aug 2018
Installation of anchor bolts only (baseplates) on 4th fl balcony for temporary tents not to exceed 180 days within a 12-month period on a single premise. not visible from street. (tent installation under separate permit).
-
Aug 2018
Install (6) new 4 pipe fan coil units, install (5) new vav terminal boxes including ductwork & thermostat, provide exhause to bathrooms tying it to existing exhuast fan. reference permit application 2018-0327-4716 for related building permit.
-
Sep 2018
Addition of 83 new hsw heads for addition of a exterior canopy 4th floor. ref app#201806202470.
-
Oct 2018
Add vestibule to entrance of the luce restaraunt to reduce air infiltration.
-
Oct 2018
Fire alarm ti 6th fl - add 3 speaker strobes, 5 speakers, 2 strobes, 4 smoke detector with sounder base, 2 sync modules for ada room, 8 duct detectors for fsd with control & 1 smoke detector for fsr with control. ref pa 2018-0327-4716.
-
Feb 2019
Interior renovation of existing luce restaurant (also to document the space as a-2).
-
Dec 2019
Add a retractable fabric canopy at an existing outdoor deck of this hotel, the space is already permitted as an outdoor place of assembly, occupancy, occupancy load, use, and egress are unchanged.
-
Nov 2023
Installation of power to a tritium rtm75 elecrical vehicle charger.
DBI holds 45 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 45. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update