37.7820, −122.4098 A locator map appears here once a Mapbox token is configured.
Know This Place

District 6 · Block 3704, Lot 078 · ZIP 94103

David Hewes Building

1 Sixth Street

  • Office building
  • 15 stories
  • 90,552 ft2
  • 11,007 ft2 lot area
  • 15 bathrooms
  • Zoned C3G
  • Historic resource
  • Sold February 11, 2016
37.7820, −122.4098 Street View appears here once a Google Maps embed key is configured.
  1. June 15, 1907

    C. A. Blume Construction Company contracted for cast iron and structural steel work on the Hewes building for David Hewes.

    The San Francisco Call, 15 June 1907, p. 15
  2. 1908

    Built as a 15-storey steel-frame tower with a brick curtain wall.

    Central SoMa Historic Context Statement, adopted 2016
  3. September 5, 1908

    Roebling construction company and O. E. Brady contracted for fireproofing, masonry, rough carpentry and roofing on the Hewes building, at $50,001.

    The San Francisco Call, 5 September 1908, p. 9
  4. 1950s

    Re-clad with green spandrel panels and restyled as a Midcentury Modern office tower; portions of the panel cladding have since failed, exposing areas of the original brick. It is a building altered wholesale into a later style.

    Central SoMa Historic Context Statement, adopted 2016
  5. Jan 1982
    Permit 8200539 $$$ $1,675

    Additions alterations or repairs.

  6. Jun 2013
    Permit 201306280809 $$$ $135,000

    Soft demolitoin of drywall, plaster and flooring materials on 4 floors. approx 25000 sq ft. includes 1st, 2nd, 3rd floors. (partial ground floor) - comply with nov# 200236116 & 20099315.

  7. Dec 2013
    Permit 201312184534 $$$ $140,000

    Addition of new sprinklers at each floor in all unsprinklered areas per nfpa 13.

  8. Dec 2013
    Permit 201312204763 $$$ $1,330,000

    Voluntary structural upgrade, interior upgrades, restroom upgrades. mep deferred permits. no exterior work in job scope. ** interim controls - market street & soma: see attached. **.

  9. Dec 2013
    Permit 201312204717 $$$ $250,000

    Barrier removal at restrooms on 4, 5, 6, 7, 10, 11, & 14 floors. project scope consists demolition of partitions, and associated electrical, plumbing and ceiling work at restrooms. install new ceilings, finishes, electrical, plumbing. no modifaction of e mechanical or structural. mechanical, electrical, ls, sprinklers, separate permit.

  10. Sep 2014
    Permit 201409226984 $$$ $2,340,000

    To comply with nov 200236116. restoring aluminum and non-structrual cladding system in designated exterior area with the following. remaining all deteriorated components and installing new flashing system, hand scrub cleaning panels, restoring operation of windows. new structural framework will be.

  11. Feb 2015
    Permit 201502279585 $$$ $1,600,000

    Ti for new cvs pharmacy on grnd floor & basement. work includes new partitions, fixtures, finished, restrooms mep, installation of new freight lift from basement to grnd floor. fire protection & shelving under seperate permit. no exterior work.

  12. Apr 2015
    Permit 201504093182 $$$ $50,000

    M, 2, 3, 4, 8, 9, 10, 14, 15 & 16th floors: demolition of non-loading partitions, finishes, lighting and ceilings. ab.017.

  13. Jun 2015
    Issued Permit 201506158928 $$$ $416,550

    3rd floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit.

  14. Jun 2015
    Issued Permit 201506158929 $$$ $199,750

    4th floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit.

  15. Jul 2015
    Issued Permit 201507060689 $$$ $576,600

    2nd floor: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit.

  16. Jul 2015
    Issued Permit 201507060687 $$$ $323,100

    Mezzanine: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit. floor in-fill under separate permit. sprinkler retro under permit application 2015-0326-1965.

  17. Jul 2015
    Issued Permit 201507282593 $$$ $528,900

    8th, 10th, & 14th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit.

  18. Jul 2015
    Issued Permit 201507282594 $$$ $525,900

    9th, 15th, & 16th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit.

  19. Sep 2015
    Issued Permit 201509036134 $$$ $180,000

    Installation of 19 fan coil units, 3 condemn. title 24 combine including duct work, mechanical plans for phase 1 on 3rd and 4th floors. ref t.i. #201506158928 & 201506158929.

  20. Sep 2015
    Issued Permit 201509036135 $$$ $180,000

    2nd and mezzanine - installation of fan coils 34 (4) condemn. title 24 combine & ductwork.

  21. Oct 2015
    Permit 201510260746 $$$ $278,000

    Installation of hvac work for 8, 9, 10, 14, 15, 16 floors: reference 2015.0728.2593 for 8, 10, 14 fl. 2015.0728.2594 for 9, 15, 16 fl.

  22. Jan 2016
    Permit 201601257867 $$$ $490,000

    11 & 12 fl: interior tenant fit out of 2 full floors as office use, including interior non-load bearing partitions, partial ceilings, lighting, finishes. floors to be single tenant occupancy. mep, life safety deferred.

  23. Mar 2016
    Issued Permit 201603081423 $$$ $231,196

    Install two new fsds on 11 and 12th floors and associated duct detectors and hvac duct work. ref. 2016-01-25-7867.

  24. Nov 2018
    Permit 201811286838 $$$ $337,513

    5th - 7th floors. demolition of non-structural & non load-bearing interior partitions and ceilings incl walls, glazing doors and finishes.

  25. Jul 2022
    Issued Permit 202207208895 $$$ $275,000

    Main lobby upgrade including replaced lighting between desk and finishes added exteior metal box covers electrical and life safety plans will be submitted as a separate permit.

DBI holds 144 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 144. 9 of them are nominal $1 street-space or sidewalk permits. 4 expired or cancelled permits are not shown.