Rose Hotel/Sunnyside Hotel
117–131 Sixth Street
-
1911
Built by Beach & Heffernan. Constructing engineers.
-
March 2, 1912
G. Albert Lansburgh was preparing plans for a reinforced concrete hotel here for the C. Meyer Estate company.
-
August 24, 1912
The contract was let for a four-storey reinforced concrete hotel of 100 rooms over four stores, 80 ft on Sixth and 100 ft on Minna, costing $57,000, with Beach & Heffernan as constructing engineers; a Seattle hotel man took a ten-year lease.
-
Jun 1985
Erect sign.
-
Aug 1985
Parapet reinforcement job.
-
Dec 1988
To repair fire damage, replace rafters and chiling joists.
-
Apr 1993
Fire repair job.
-
Jun 1996
Rehabilitation of existing 99 unit hotel.
-
Mar 1997
Fire sprinkler protection provided, 2nd tp 4th floor.
-
Apr 1999
Retail build at new groun floor vacant space.
-
Jun 1999
Add few sprinkler hds to existing; rev to 9907875.
-
Jun 2000
Install 2 doors to existing office.
-
Jan 2001
Construct a pizzaria in an existing vacant. retail space at the rose hotel 125 6th st, sq ft (address o.
-
Aug 2010
Obtain a building permit for sign located at 125 6th street as required by sign i.d number "orig 1186" per n.o.r dated may 24, 2010. block and lot#3725/079.
-
Nov 2015
One unit patch drywall. one unit drywall floot cut's one unit drywall patch. 4th fl bathrm-flooring, drywall, reset toilet & sink. 3rd fl bathrm, flooring, drywall, reset toilet & sink. 2nd fl bathrm flooring, drywall, reset toilet & sink. electrical & lighting in all bathrms. n/a for maher.
-
May 2016
Bathroom on 1-2-3 floors and hallway in front of the bathroom; drywall hallway under layment fooring. toilet on 3- floors insulation on 3-floors new flooing ceiling tiles. n/a maher ord. # 155-13.
-
Jun 2018
Reconfigure duct work at existing exhuast louver.
-
Nov 2020
Reroofing.
-
Aug 2021
Renew permit #9706484 for commencement of work approved under 9706484.
-
Jun 2024
Install 2nd entry door at reception area and reconfigure reception area layout. no exterior work.
-
Jul 2024
Create 3 communications units with fire strobes. convert existing common bathrooms wtih tubs to new common bathrooms with roll in showers. modernize existing elevators with new controls.
-
Oct 2025
Like for like replacement in accordance with 2008 csfm information bulletin "fire alarm control unit replacement in existing building". the existing faci is no longer supported & id being replaced with new est control panel. all initiating devices & notification appliances are being replaced on one-for.
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31. 1 of them are nominal $1 street-space or sidewalk permits. 5 expired or cancelled permits are not shown. The assessor dates the building to 1911, but its construction contract was let in August 1912.
Nearby
- 106–112 6th Street Same street
- 118 6th Street Same street
- 101–111 Sixth Street Same block
- 987–989 Mission Street Same block
- 133–135 Sixth Street Same block
- 476 Minna Street Same block
- 986 Mission Street Around the corner
- 982–984 Mission Street Around the corner