Alden Hotel
169–183 Sixth Street
-
1912
Built.
-
May 19, 1912
Western Planing mill, R. D. Felt, C. S. Amsler, H. L. Petersen and Peterson-James company contracted to put up five-storey and basement rooms and stores, at $22,237.
-
Dec 1987
Parapet reinforcement.
-
Oct 1997
Repair fire damage room at 4th floor & roof area.
-
Aug 1998
Repair fire damage two units.
-
Nov 2002
Repair fire damaged one room drywall, ceiling, window and sink.
-
Sep 2004
To install fire sprinkler system to comply with ord#170-02. (addition to app#200301316405 bsmnt &.
-
Feb 2005
Replace all windows with double dual glazed vinyl in kind.new windows set back 2". comply nov.
-
Aug 2005
Non structural work- converting four rooms to common bathrms also remodeling of all (.
-
Oct 2005
Glass replacement on lobby 6th street side and natoma.
-
Dec 2005
Replace lath and plaster at lobby and retail spaces with 5/8 " type x gypsum board also replacing of glazing at front. adding/construct new accessible bathrooms demolition old bathrooms, no structural work.
-
Jan 2006
Replacing door to roof & ground floor exit door also replacing of galvanized sheet metal at five existing garbage rooms.
-
Dec 2007
Office tenant improvement on ground floor. new partition walls, mechanical, electrical, plumbing., accessible path of travel and restrooms. minor store front revision. fire sprinkler under separate permit.
-
Dec 2007
Ground floor - office tenant improvement on ground floor. partition walls, new mechanical, electrical, plumbing finoshes, accessible path of travel and bathroom. minor store front revision. fire sprinkler under separate permit.
-
Jun 2008
Relocate 18 sprinklers heads & add 11 new heads to existing fire sprinkler system.
-
Feb 2009
Erect (2) non-electrical double faced projecting signs.
-
Jan 2012
Drywall repair caused by water damaged. approx. 600 sq ft. ground floor area only.
-
Apr 2013
New aluminum framing & glass at existing security counter.
-
Oct 2018
To replace (3) bathroom windows, waterproof, dispose of old windows to comply with nov # 201876652 item 2.
-
Sep 2022
Install new sheetrock on water damage common area stairwell and hallways walls and ceilings. (partial repair wall total 210 sq ft and ceiling 36 sq ft) 2nd floor to 5th floor.
-
August 28, 2026
Advocates fear Hospitality House closure is part of larger pattern — San Francisco Examiner
DBI holds 38 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 38. 5 of them are nominal $1 street-space or sidewalk permits. 6 expired or cancelled permits are not shown.
Nearby
- 162–170 6th Street Same street
- 172–180 6th Street Same street
- 185–193 Sixth Street Same block
- 496–498 Natoma Street Same block
- 479 Natoma Street Same block
- 157–161 Sixth Street Same block
- 991–993 Howard Street Around the corner
- 989 Howard Street Around the corner