172–180 6th Street
76-unit apartment building
-
October 31, 1912
McGowan & Butler contracted for brick work on a class C building, then going up, at $9,000.
-
December 19, 1912
Hoffman & Meuser contracted for the steam heating system, oil burner and oil storage tank of a six-storey and basement class C building, at $3,100. Cross streets: SW line of 6th Street, 72 feet NW of Howard.
-
1913
Built.
-
Jun 1989
Reinforce brick parapets epr notice prepared by bbi.
-
May 1990
Revise plans for parapet reinforcing as permit no.8910300.
-
Sep 1997
Renovate all kitchens, bathrooms, replace all doors corridor.
-
May 2001
Installation of a fire alarm system for residential per cbc section 310.10.
-
May 2002
Install new concrete retaining wall in existing basement for future electrical transformer.
-
Nov 2002
Mechanical, electrical, plumbing work only at grd floor tenant improv.accessible units, laundry rm per.
-
Mar 2003
Reroofing.
-
May 2003
Sprinkler system retrofit to meet sro on floors 2-6, and basement, install fire sprinklers in commerci.
-
Aug 2017
Remove existing elevator and replace with new electric traction elevator within existing shaft. this is a barrier removal project. to comply with nov 201765111, dated 3/2/2017, and 201763832, 3/3/2017. no exterior work. elevator serves residential hotel portion. n/a maher.
-
Sep 2019
Install new fire alarm system to meet sffc 1103.7.6.1. 1 facu, 2 annonciator, 4 power supplies, 72 smoke detectors, 1 pull station, 7 relays, 10 monitor modules, 4 nac modules, 7 strobes, 1 bell, 48 horn strobes, 5 lf hornstrobes, 95 lf sanders. ** maher: n/a **.
-
Aug 2023
One unit "dwelling unit": to comply with nov 202301376. retrofit one window in living room. install linoleum flooring (approx 400 sq ft). baseboard kitchen cabinets. bathroom vanity. toilet.
-
Apr 2024
Install new interior electrified door for security opens by buzzer or fob; replace steel door @ street with new steel door. work @ street level only.
-
Jul 2024
Modernize community room, basment complete repair of struc damage misc exterior repaint.
-
Jul 2024
Correct nov# 202294452 - cover drywall areas on 3rd - 5th floors in laundry rooms. drywall @ laundry room on 3rd, 4th, 5th floor - approx 200 sq.sq ft. nothing visible from street view.
-
Jan 2026
Reroofing: existing roof recover sow using single ply tpo, no existing bur roof system materials will be removed, no hot work.
-
Feb 2026
#314: replace-70 sq ft of drywall in kitchen, new kitchen cabinets and countertop, following existing layout, like for like.new light fixture in kitchen.#214: replace 70 sq ft of drywall in kitchen, new kitchen cabinets and countertop, following existing layout, like for like.new light fixture in kitchen&bathroom.
-
Jun 2026
Three units: install insulation, drywall, doors, flooring, trim where missing prime & painted affected area.
DBI holds 75 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 75. 7 of them are nominal $1 street-space or sidewalk permits. 7 expired or cancelled permits are not shown.
Nearby
- 169–183 Sixth Street Same street
- 184 6th Street Same street
- 162–170 6th Street Same block
- 152–160 6th Street Same block
- 521–523 Natoma Street Same block
- 516 Natoma Street Same block
- 496–498 Natoma Street Around the corner
- 1025 Howard Street Around the corner