37.7732, −122.4039 A locator map appears here once a Mapbox token is configured.

572 7th Street

South Of Market · San Francisco, CA 94103

  • Built 1938
  • Office building
  • 1 story
  • Zoned M2
  • District 6
  • Historic status: historic resource
37.7732, −122.4039 Street View appears here once a Google Maps embed key is configured.
12,000 sq ftBuilding area
8,000 sq ftLot area
4Rooms · 1 bath
  1. 1938

    Built as an automobile freight building. Designed by George Wagner.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  2. 1967

    The loading dock was enclosed.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  3. Oct 2012

    Enlarge mezzanine to become 2nd floor. new stairs to 2nd floor, new ada lift centry modify entry to accomodate access.

    Expired Permit 201210021161 $$$ $100,000
  4. Nov 2013

    Add fire sprinkler heads under new mezzanine floor connected to existing. total add 32 ground floor. ref t.i. app#201210021161.

    Complete Permit 201311081537 $$$ $16,448
  5. Nov 2013

    Tenant improvements office.

    Complete Permit 201311262848 $$$ $750,000
  6. Feb 2014

    Nw fire alarm devices for t.i. there is an existing protected promises fire alarm system in place.1 powr supply, 1 monitor module, 1 relay module, 1 weatherproof duct detector, 18 horn/strobes, 6 strobes. t.i. app#201311262848. n/a for the maher ordinance #155-13 & n/a for the interim controls #428-13.

    Complete Permit 201402128377 $$$ $8,000
  7. Mar 2014

    1st & 2nd floor - relocate, add & remove fire sprinkler heads per tenant improvements, 35 relcoated, 3 removed, 4 added. ref #2013.1126.2848. compliance with ordinance #155-13 not required.

    Complete Permit 201403140788 $$$ $20,046
  8. Apr 2014

    Add 1 10 ton rooftop ac unit, 6 split system ac units, 2 rooftop fans, 2 gravity vents and all associated ductwork and refrigerant piping.

    Cancelled Permit 201404153279 $$$ $200,000
  9. Mar 2017

    To obtain final inspection of work approved under permit application 201210021161. all is complete.

    Complete Permit 201703101194 $$$ $1
  10. Jun 2017

    Street level - non-structural demolition of storefront; install new storefront system, including glazing and entry doors. install new cement plaster details; exterior cleaning and painting. maher na.

    Complete Permit 201706219959 $$$ $98,500
  11. May 2026

    Demolition of interior non-structural partitions and finishes, lighting, millwork, and equipment in preparation for forthcoming tenant improvement project. mep's/ fs are desing build and under separate permits.

    Issued Permit 202605010484 $$$ $75,000
  12. May 2026

    T.i. of an existing office space. new millwork and office partitions. remodel of existing restrooms. no exterior work. no work to egreess components. mep and fire sprinkler are deferred permit.

    Issued Permit 202605292118 $$$ $20,000
  13. Jun 2026

    Demolition existing ductwork and registers. reduct existing fancoil unit to serve the new layout. furnish and install new return transfers. air balance existing registers ref permit application 202605292118 & 202605292119.

    Issued Permit 202606263998 $$$ $45,000
  14. Aug 2026

    Revision to permit application 202605292118. new ground floor robotics testing lab layouts. new ground floor 8'-0" high partitions with structural steel posts. new ground floor 8'-0" high partitions with diagonal kickers.

    Filed Permit 202608146609 $$$ $7,500

1 nominal $1 street-space or sidewalk permit is omitted from the timeline.

Not yet documented: the developer and the early tenants. Submit an update