808 Brannan Street
South Of Market · San Francisco, CA 94103
-
1930
Built as an industrial building, recorded as occupied by United Drug Co.
-
Jul 1984
Selective demolition-remove elevator walls, certain stairs.
-
Jul 1984
Develop facilities, new elevators, existing title 24.
-
Oct 1999
Oti-1 2/f el sp.
-
Dec 1999
Oti-2 2nd floor me.
-
Jan 2000
Oti-3 2nd floor el.
-
Apr 2000
Oti-1: el, ms & sp (2nd fl).
-
Feb 2012
Remodel of existing restroom to ada compliance. remodel of interior hand and guard railings to ada compliances. addition of 2 interior doors and enclosure of existing rated corridor. repair misc interior elements.
-
Mar 2012
New fire alarm and new sprinkler monitoring system (elevator recall) for core and shell 0f building.
-
May 2012
Removal of existing canvas awning and aof new steel and glass canopy over existing entry. upgrade of facade finishes.
-
May 2012
New interior stair, ramp, and guardrails, upgrade to ada lift.
-
Jun 2012
Replace existing rooftop package ac units with new roof top package ac units.structural for the ac units, were approved under 201205090095.
-
Jan 2013
T.i.: construction of new offices, conference areas, breakroom and additional restrooms.
-
Jan 2013
Mechanical and electrical for tenant improvement. ref arch 2013-01-28-8866.
-
Jan 2013
Voluntary strengthening of building. not comply with current code in effect.
-
Mar 2013
Add new horn/strobes in open office areas, conference rooms, breakrooms & showers. new duct detectors added to new roof top one unit new horn/strobes & 14 new duct detectors.
-
Mar 2013
Fire sprinkler permit: add 33, relocate 38 and delete 14 pendents. add 12, relocate 15 and delete 12 uprights. relocate 3 and add 2 sidewalls. t. i. app#201301288866.
-
Feb 2019
Tenant improvement to consist of new non load bearing partitions, selective demolition. new millworks and finishes. mep an fire ls sep permit.
-
Feb 2019
Mechanical and electrical for tenant improvement on the 1st and 2nd fl ref 201902112547.
-
May 2026
Demolition of interior non-structural partitions and finishes, lighting, millwork, and equipment in preparation for forthcoming tenant improvement project. mep's/ fs are desing build and under separate permits.
-
May 2026
Supply & install additional power at the basement, 1st floor, 2nd floor via base feeds, cord drops & outlets. install subpanel for additional circuits.
-
May 2026
T.i. of an existing office space. new millwork and office partitions. remodel of existing restrooms. no exterior work. no work to egreess components. this permit is addressing violation#: 202656822 ( inetrior only ). mep and fire sprinkler are deferred permit. ecterior work voilation under seperate permit.
-
Jun 2026
Brick repairs to remove damaged brick above windows. clean and salvage. clean exposed steel and apply corrosion inhibitor. reinstall salvaged brick and blue diamond tiles to match existing layout. new mortar to match existing as closely as possible. mortar repairs-as needed to be replaced in kind. window.
-
Jun 2026
Supply & install additional power at the basement, 1/f, 2/f via base feeds, cord drops and outlets, install sub panel for additional circuits. supply & install light fixtures through basement, 1/f and 2/f.
-
Jun 2026
Demolition existing ductwork and registers. reduct existing fancoil unit to serve new layout. furnish and install new return transfers. air balance existing registers ref permit application 202605292118 & 202605292119.
DBI holds 41 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 41. 3 of them are nominal $1 street-space or sidewalk permits.