680 8th Street
South Of Market · San Francisco, CA 94103
-
1956
Built as a commercial building, recorded as occupied by Sobel Design Center.
-
1967
Built as a commercial building.
-
Nov 1985
Cut windows into walls, repair roof & provide skylights.
-
Apr 1986
Add 163 fire sprinklers to existing systems.
-
Aug 1987
Build cafe style restaurant, no flame, no hood, new electrical/plb.
-
May 1988
Cut new windows into existing walls off buildings.
-
Jan 1992
Saw cut ext. conc. wall and add windows.
-
Nov 1992
Correct approv permit - show correct entry door config/corrd.
-
Aug 1993
New partition wall-new street entry.
-
Apr 1996
Reroofing.
-
May 1996
Cti-1 2ndfl, el, me, sp.
-
Apr 1998
Paint existing ceiling level concrete floors install 8' walls.
-
Apr 1999
Reroofing.
-
Jun 2000
Reroofing.
-
Dec 2008
Response to violation #200839192 to interior remodel of a commercial space. new partitions, m.e.p. under seperate permit.
-
May 2012
Space #163-correction of notice of violation #200839192 for existing wholesale-retail door showroom. work includes non bearing partitons, lighting, disabled access upgrade at restrooms. new display cooktop/kitchette. no change to mechanical, no structural work. fire sprinkler under seperate permit.
-
Jul 2013
1)t.i. of 700 sq ft space into spa. 2)upgrade existing unisex bathroom.
-
Aug 2013
Disabled access path of travel barrier removal at g/f including main entrance east side, parking lot entrance, ramp at parking lot, 3 disabled accessible parking spaces, exterior directional signs, ground floor mens & womens toilet rooms and drinking fountain.
-
Oct 2013
T.i. of existing wholesale showroom space #155 to be used as domestic appliance showroom. work includes new non bearing, not rated partitions, lighting, 2 working demonstration kitchens and active laundry desplay, level existing floors and soffit above hood display. mechanical under separate permit.
-
Dec 2013
To erect electric wall sign.
-
Jan 2014
Install hvac supply and return duct work to serve show room and office. install t-24 compliant thermostat.
-
Jul 2023
To comply with abe# 202206081338, including partial sidewalk replacement & power door operator installation. voluntary upgrade of secondary entrances, including partial sidewalk replacement & installation of a wheelchair lift.
-
Feb 2024
Perform ordinary maintenance to general advertising sign as specified in attached engineering plans in accordance with planning code section 60a.
-
May 2024
Provide new fa system for the monitoring of the sprinkler. install 4007 es facp; faa communication, smoke detector, pull station, (2) monitor modoules.
-
Mar 2025
Rear ramp-volutary modify the existing ramp at the rear parking lot to comply with current access standards, including new concrete extensions and topping new guardrail and wheel guide new battery powered actuated door closer and new signage.
-
Aug 2026
Barrier removal. installation of new platform lift and related foundation, alteration to existing stairs, handrails, landings and stair tread/nosing guards, new electrical outlet for lift.
DBI holds 57 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 57. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update