699 8th Street
South Of Market · San Francisco, CA 94103
Permit history
-
Apr 1988
Five story apparel mart.
-
Mar 1990
Partitions, lights etc. for "; ready to lease".
-
Sep 1998
Mm1 - el-me-sl-sp 6th floor.
-
Nov 2006
New townsend street building entrance with elevator & exterior canopy, remove east escalators and install new elevators (2) to roof. life safety and fire sprinklers under seperate permit.
-
Nov 2010
4th floor-interior renovation of non bearing partitions & interior storefront to constrct new corridor. work includes ada upgrades and no exterior modifications or increase to office space.
-
Nov 2010
Ti upgrade in existing vacant tenant areas-new metal framed partitions, glazing, doors/hardware, painting, floor covering, acustic ceiling etc.new electrical, plumb, hvac&lite. no exterior modifications, no increase in office space.demolition under 201009030203. life safety, fire sprinklers&kitchen sep permits.
-
Nov 2010
Constr new exit corridor concourse level, fl infill at st levelw/new stair down, constr non fire rated demising wall fls2, 3, 5&6, new glazing level 4, new railings levels 3, 5&6, new elev openings with access bridge at levels 3, 4&6, replace skylight.no incr in offe space.no exterior modifi/fire spri sep perit.
-
Apr 2011
Floor 5 & 6 - revision to appl #201011104737: change to interior non-load bearing walls, thus changing floor exiting from original permit, new finishes in existing restrooms. mechanical, electrical, life-safety under separate permit.
-
Oct 2011
5th floor - ti consists of demolition of existing offices, non-load bearing walls, doors/frames, acoustical ceiling tile/grid and finishes. new interior non load bearing walls, doors, light fixtures, new millwork. mep and fire life safety under separate permit.
-
Apr 2012
Tenant improvement modifications to 4th suites 425 and 410. open office spaces private offices, conference rooms copy rooms and break room mep under sep permits.
-
Jan 2014
Tenant improvement consisting of non-structural demolition of existing offices, new construction to include partitions, glazing, door, millwork, lighting, electrical & mechanical.
-
Apr 2017
Roof level- remove and replace existing waterproofing membrane and concrete topping slab at roof level, restripe parking layout, non structural work, no interior modifications. n/a ordinance #155-13.
-
May 2018
Core and shell improvement for construction of 1 hr atrium, boundry walls, doors, frames, non-doors, frames, non-door & window systems on floors 2, 3 & 6. other work includes bathroom renovations, and associated selective demolition.
-
May 2018
Ti work on 2nd floor: partitions, ceilings, doors & frames, millwrok finishes & mep work for office spaces, kitchen with dining & servery area & auditorium with fixed seating. other minor work on 1st floor, concourse & roof lvl for bicycle storage, grease equipment & new roof top equipment.
-
May 2018
This is an atrium improvement project. work includes new interior partitions, doors/frames, finishes, ada lifts, stairs, ramp, lighting & mep work. reference permit application 2018-0307-3080 for approved exterior work. smoke control update.
-
Jun 2018
6th floor - ti work in vacant 6th fl office space. work includes partitions, ceiling installations, light fixtures, doors, frames, millwork, finishes & micro-kitchen with dining & servery area. maher na.
-
Jun 2018
Ti work in vacant office space on 3rd fl. work includeds partitions, cieling installations, light fixtures, doors, frames, millwork & finishes. maher na.
-
Jun 2019
3rd floor - minor demolition - construction of non bearing interior partitions in vacant suite for new opn office and meeting rooms.
-
Jun 2019
4th fl - minor demolition pa 2019-0516-0883 construction of non-bearing interior partitions in vacant suite for new open and meeting rooms.
-
Aug 2019
6th floor: interior tenant improvement of existing built out office space ont he 6th floor. construction to include new partitions, finishes, lighting and pantry.
-
Aug 2019
5th floor: interior tenant improvement of existing built out office space ont he 6th floor. construction to include new partitions, finishes, lighting and pantry.
-
Oct 2019
2nd floor: minor demolition and construction of non-bearing interior partitions in currently vacant suite for new open office and meeting rooms and add one single use all gender restroom. n/a for maher.
-
Dec 2019
Basement - interior ti includes demolition of existing partitions, floor finishes, ceiling & lighting. new partitions, doors, poiwer & tele/data, lighting & millwork. mep deferred.
-
Dec 2020
Concourse: interior commercial office tenant improvement. minor demolition. construction of non-bearing interior partitions.
DBI holds 691 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 691. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update