Nov 2000
Fire sprinklers sytem for 4 floors.
-
Jan 2001
Life safety equipment added to all four floors.
-
Dec 2005
Tenant improvement on all floors for new tenant. interior work only. sprinklers and fire alarm under separate permit. fuel oil & generator under seperate permit.
-
Dec 2005
Fire alarm upgrade on all floors.
-
Feb 2006
Add and relocate fire sprinklers for tenant improvement on all floors (4 floors total) 142 heads.
-
Feb 2006
Install 9 fire sprinklers in gyb board ceiling added to shell building. ceiling addition required for shell building final. all other fire sprinkler work finaled on 1st floor only.
-
Mar 2006
Install 9 concrete bollards at front of building infill of non-required exit on 1st floor new canopy at main entrance. not visible from street.
-
Apr 2006
Install new deisel generator, fuel oil pump and fuel oil piping system. no new interior partitions under this permit.
-
Nov 2006
Revision to app#200604078470. revise fuel port access louvers and enclosed fuel oil port and pipe behind 3hr rated partition/enclosure.
-
Mar 2007
Revision to appl#200512059471 purpose is to document as built condition following emergency generator circuit breaker and ats addition. electrical work associated was performed on e200702085020.
-
Jan 2012
1st floor only - (4) new offices, (3) new phone rooms. flooring, av upgrades, related electrical, hvac. fire sprinkler under separate permit.
-
Apr 2012
Modify existing fire sprinkler system due to tenant improvement of existing office space. t.i. permit application 2012-0125-2839. add 6 flexheads and 4 pendants.
-
Apr 2012
1st floor: fire alarm t.i. at 625 townsend. 4 wall strobes.
-
May 2012
1st floor-revision of 2 existing evacuation map signage.
-
Jul 2016
2, 3 & 4th floors: partial ti- non structural. mep/fie/life safety under sper permit.
-
Dec 2016
2nd, 3rd, & 4th floors: fire alarm tenant improvement. ref 201607132199. add 6 strobes. n/a for maher.
-
Aug 2018
1st floor: adding a gender neutral shower along with selective demolition and new finishes. 2nd, 3rd, & 4th: add 2 gender neutral restrooms to each floor, selective demolition and construction of new partitions and finishes.
-
Sep 2018
1, 2, 3 and 4th fl - mep drawings for previously approved architectural set. ref pa 2018-0829-8654 2, 3, 4th fl add bathroom. 1st floor add gender neutral shower, new ducts and registers at 3rd fl. roof - new exhaust fan. n/a for maher.
-
Nov 2018
2nd floor: relocate 3, 3rd floor: relocate 3, 4th floor: relocate 3 to conform with new wall/ceiling layout of the t.i app#201808298654.
-
Nov 2018
Ref pa 2018-0829-8654 - modify existing fire alarm system. add 3 duct smoke detectors, 3 sampling tubes, 3 high power control relay, 6 wall strobe. demolition 3 wall strobes.
-
Mar 2020
Same capacity replacement of heating hot water hhw b0ilers, quantity 2. same location as existing not visible from street.
-
Jan 2022
Remove and replace existing edwards est-3 fire alarm control unit with new generation edwards est-4 facu as per csfm info bulletin dated sept. 4, 2008. add 1 cellular communicator.
-
Sep 2025
Removal of existing 150kw generator and removal of select electrical systems. installation of new 30kw generator, wiring and other related electrical systems.
-
Jan 2026
Provide a modification of the existing fire alarm system on the roof. add 2 single input module for generator leak detection and generator in the auto. ref permit application 2025-0908-4777.
DBI holds 42 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 42. 3 of them are nominal $1 street-space or sidewalk permits.