700–750 7th Street
Mission Bay · San Francisco, CA 94107
-
1905
Built as the Baker & Hamilton warehouse, a heavy timber-framed brick building that became the model for several later warehouses in the district. Designed by Sutton & Weeks.
-
Oct 1990
Modify existing fire sprinkler system by relocate 21 sprinkler hd.
-
1995
Listed on the National Register of Historic Places as the Baker & Hamilton warehouse.
-
Jun 1999
Seismic, electrical, mechanical & life safety upgrades.
-
Oct 1999
Sprinklers for site permit #9911656s.
-
Nov 1999
Revise to ap #9911656/s revise site app per cu.
-
Mar 2000
Revision to 9911656s. this is to upgrade basement bathrooms to comply with ada.
-
Jun 2000
Oti-1 2nd floor electrical mechanical lifesafty sprinkler.
-
Jun 2000
Oti-1 3rd floor el, me, l/s, sp.
-
Jul 2000
Improvements for upgrading the existing storage use including a west entrance, new exit.
-
Aug 2000
T/i partition walls doors employee's break rm outlets light fixtures & cabinetry.
-
Aug 2000
T/i partition walls doors employee's break rm outlets light fixtures & cabinetry 3/f.
-
Apr 2004
Interior demolition all floors & structural repair to prep.for future t.i.
-
May 2004
Renovation of office building. on all floors, new mechanical, electrical & plumbing.
-
Aug 2004
Exterior improvements: new canopy and entrance.
-
Jun 2008
2nd floor-provide/install electrical infrastructure to support new engineering lab including 1 225 kva transformer, 1 800 amp 208v dist. board, 1 200 amp 480 v feeder, 2 200 amp 208 v panels, relocate existing fixtures.
-
Dec 2010
Adobe systems plans to install fuel cell power generating equip in s. exterior veranda at sq ft facility genreate electrical on site.encroach onto public right of way along king st, will be a major encorachment by bsm.
-
May 2014
Partial 3/f tenant improvement to include non-structural demonition, new partitions to create phone rooms, work stations and soft seating. mechanical. electrical under separate permit. n/a ordinance #155-13.
-
Sep 2015
Partial floor t.i. in the basement including non-structural demolition of partition walls replacing with expanded storage and non-load bearing partitions. n/a for maher.
-
Nov 2015
1st floor: t.i. on 1st floor including the renovation of an existing employee cafeteria, the existing shipping & receiving space and relocating two conference rooms; maher n/a.
-
Nov 2015
0n 1st floor and new exhuast duct and shaft to roof - mep associated with pa 2015-1116-2642 including new ductwork, lighting & t-24.
-
Nov 2015
1st floor partial floor t.i. including new partitions & relocation of fitness room & pantry & refresh of dining space & associated m.e.p. fire life safety under separate permit. n/a maher ordinance.
-
Jul 2016
1, 2 & 3rd floors: ti- non structural. mep/fire/life safety under sep permit.
-
Feb 2018
Paint windows, replace window perimeter caulking, repair failed parge coatings at window sills and ledges. repair any loose bricks. repair mortar joints as required. rinse walls with water.
-
Mar 2019
Patio ground floor replacement of existing awning panels and demolition at patio; all the newworks shown are for reference only, light fixtures, patio work and are under separate permit.
-
Mar 2020
2nd floors: replacement of condenserwater system, computer room air conditioners, and ups room fan coil with new dx computer room air conditioners and split system dx for ups room.
-
Jun 2026
1/f: dishwasher replacement. structural, electrical and mep drawings included.
DBI holds 142 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 142. 18 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update