650 7th Street
South Of Market · San Francisco, CA 94103
-
1908
Built as an industrial building, brick construction, recorded as occupied by Charles Harley Co. Designed by Albert Pissis.
-
Jul 1983
Misc.
-
Aug 1984
New wall finish ceiling ffinish floor finish floor.
-
Feb 1985
Build out space with partition, sprinklers, electric/telephone.
-
Oct 1988
Interior partitions, lighting, sprklr system, heat pumps.
-
Jun 1989
New partitions, doors, ceiling, floor finishing modification.
-
Aug 2012
1st/2nd/3rd/4th floors-selective demolition-removel of architectural fininshes, m.e.p distribution. per ab-017.
-
Oct 2012
New communication stair between floors 1, 2, 3. new opening in structural wood floor deck for communicating stairs.
-
Oct 2012
Tenant improvement 3rd floor consisting new partitions, glazing, door, millwork, strucurtal framing for non load bearing partitions. mep, sprinklers, fire alarm under separate permit.
-
Oct 2012
Tenant improvement on 2nd fl consisting of new partitions, glazing, doors, millwork. mep, sprinkler, fire alarm on sep permit.
-
Oct 2012
Tenant improvement on 1st fl consisting of new partitions, glazing, doors, telcom, av structural support framing for non load bearing partitions. mep, sprinklers, fire alarm on seperate permit.
-
Oct 2012
T.i. basement level consisting of new partitions glazing, doors, millwork. no structural work. mep, sprinklers, fire alarm on seperate permit.
-
Apr 2013
Fire sprinkler system existing ti-changed out to quick response, 1130 new sprinklers, 9 new valve assembilies. no ug under this permit.
-
May 2013
4th floor t.i. consisting of new partitions, glazing, doors, millwork, lighitng fixtures, a/v telcom, enlarge roof deck. mechanical, electrical, plumbing, life safety & sprinklers under separate permits.
-
Aug 2016
Upgrade doors with card reader at stairwells. door functions to remain. maher not req.
-
Oct 2016
Replace 2 existing rooftop air conditioner units with 2 new roof top units. new ducting maher na.
-
Nov 2017
3rd & 4th fl: ti work including new partitions, doors, door frames, and ceilings, etc. mep, life safety, and sprinkler under seperate permit. building is fully sprinklered. maher na.
-
Nov 2017
2nd fl: ti work including new partitions, doors, door frames, and ceilings, etc. mep, life safety, and sprinkler under seperate permit. building is fully sprinklered. maher na.
-
Nov 2017
1st fl: ti work including new partitions, doors, door frames, and ceilings, etc. mep, life safety, and sprinkler under seperate permit. building is fully sprinklered. maher na.
-
Mar 2018
Mep for ti on 2nd floor. minimal adjustments to ductwork new vav boxes for room additions. new electrical ref pa 2017-1122-4665 & 201803153764.
-
Mar 2018
Mep for ti on 3rd and 4th floor. minimal adjustments to lowside duct work new vav boxes where required and electrical work ref pa 2017-1122-4661.
-
Mar 2018
Mep for ti on 1st floor adjustments to lowside duct works, vav boxes added where required for room additions and electrical work for ti ref pa 2017-11224666. n/a maher; rev arch: 201803153763.
-
May 2019
The project is a small amount of ti in existing office space involving partitions, furniture & lighting. lighting/electrical will be under a deferred submittal.
-
Sep 2025
Level 1, 2, 3: new partition construction for mechanical shaffs & partial demolition of e) floors. new mechanical equipment, ductwork at roof.
-
Sep 2025
Interior ti of ground fl existing office space. mechanical deferred.
DBI holds 84 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 84. 2 of them are nominal $1 street-space or sidewalk permits.
The statement's narrative dates the warehouse to 1908 in one passage and 1911 in another; its survey data table gives 1908. Not yet documented: the developer and the early tenants. The assessor dates the building to 1903; the city's 2011 survey of Showplace Square and the northeast Mission dates it to 1908. Submit an update