93–99 9th Street
South Of Market · San Francisco, CA 94103
Permit history
-
Jan 1983
Iron hand railing.
-
May 1984
Install shower stool bring present electric to code erect.
-
Jun 1988
Replacement installation of 123 windows in hotel.
-
Apr 1989
Add 2 massage room & a handicap restroom.
-
Sep 1989
Repair and rebuild bathroom in second, third and 4th floors.
-
Dec 1989
Reroofing.
-
Dec 1990
Parapet reinforcement.
-
Jun 1996
Install rooms & shower per plan & install newbathrm.
-
May 2001
Siesmic retrofit existing masonry structure.
-
Mar 2003
To install fire sprinkler system to comply with ordinance #170-02.
-
Apr 2003
Rev. to orig. permit application 32001/05/29/0130: foundation, cross wall below 2nd grid 6.5.
-
Oct 2003
Install new fire alarm system.
-
Jul 2004
Completion of work ap#200105290130 & 200304253132.
-
Aug 2004
Install sprinkler system in basement.
-
Dec 2004
Revision to permit application 2004/11/19/9762 move bathroom to different location.
-
Jan 2006
Remove and reframe non structural walls, electrical, plumbing, counters/cove, flooring/finishes, new equipment. no exterior. signage under separate permit.
-
Feb 2006
Revision to app3200310288725 &200507278742 to cover additional devices. installed per the request of the fire inspector in order to get project signed off.
-
Jan 2008
Change of use from massage parlor to medical cannabis dispensary. interior painting, replace flooring and general maintenance.
-
Apr 2008
Install fire alarm system in existing tourist hotel. existing fire alarm system conduit wires, equip. installed under expired appl.'s 2003 1028 8754 and 2006 0224 5384 to be re-used where possible; existing devices to be removed if not possible. elevator shunt trip and elevator recall not provided.
-
Jan 2009
Revision to permit application 200804089076, voluntary extend fire alarm system into commercial area per eid inspector, add 2 power supplies, 3 smoke detectors, 6 heat detectors, 7 pull stations, 3 stroes, 33 horn/strobes, 4 (7 amo hr 120) batteries, removing 1 control module & 12 horns.
-
Sep 2018
One unit: fire repair. replace in kind. no structural damage. repair drywall, replace carport, and paint.
-
Nov 2018
Like for like fire alarm replacement. replacing facp, smoke detectors, manual pulls. existing notification devices will be used as originally designed. this satifies and is in compliance with u.l. standards.
-
Oct 2024
Change of use from medical cannabis dispensary to retail general market. to comply with nov 202427441, 200225321 & 2024003678enf. comply with info sheet da-02 attached. remove awning; reverse security gate swing.
-
Apr 2026
New store front.
-
Apr 2026
Door and window replacement.
DBI holds 53 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 53. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update