Permit history
-
Nov 1989
Ewo(s).
-
Nov 1989
Ewo(s).
-
Apr 1996
To comply with umb ordinance.
-
May 1998
Construction of 1500 sq ft of office area within the existingwhse.
-
Jul 2002
Reroofing.
-
Apr 2010
Soft demolition on 4-wall and 2-landings & non-structural columns @ rear of building. (per ab-017 - exception to requirements to disabled access vacant spaces) per plan.
-
Jun 2010
Change of use / occupancy from existing warehouse to new winery. soft demolition permit approved under seperate permit. t.i convert to winery, demolition left to complete: existing bestroom & slab cut for trench m mechanical & lighting under separate permit.
-
Jun 2011
Install fire sprinkler system in existing building, 69 new sprinklers with 6-inch underground. ref permit application 201006094158 & permit application 201012237279.
-
Jun 2014
Change of occupancy from s2, b to f2, s2, a2, b. remodel existing storage space into small beer manufacture & tasting room to include mechanical, electrical, plumbing. ** maher: compliance with ordinance no# 155-13 not required **.
-
Jul 2014
To erect projecting banner sign, double faced non-electric projecting sign. n/a ordinance #155-13.
-
Nov 2014
Install 55 sprinklers throughout entire tenant space on ground floor per nfpa#13 and 12' of 4-inch underground piping. monitoring under sep permit. ref. appl. 2014.0611.8164.; maher n/a.
-
Feb 2015
Fire alarm system for new brewery. t.i. permit application 201406118164. n/a ordinance #155-13.
-
Jan 2018
Ti- will include update of fixtures to the existing 2 story bld to be used as an exhibition space with an increased occupant load. restrooms and exit passageway and refreshments to be made accessible. mep/fire/life safety under sep permit.
-
Apr 2018
Extend existing sprinkler system to adjacent space, total 84 new sprinklers maher na.
-
May 2018
Install (1) new rooftop heat pump package unit - no gas. install (1) new split system 2 ton ac unit. install (1) bathroom ceiling exhaust fans. install (1) new circulating fan in warehouse. maher na.
-
May 2018
Revision to 201801188922 new interior window in a non load bearing partition. new furring wall and new non load bearing partition at storage room and it closet maher na.
-
Jun 2018
Title 24 for renovation of existing space. provide new light fixtures and plugs ref 201801188922.
-
Nov 2018
Install electric double faced projecting sign: bluxome center".
-
Oct 2020
T.i. of 8410 gsf with in existing 1-story with mezz building. no proposed change with the 9e0 building use ortype of construction.the building will continue to include wine production, office & assembly spaces. hvac included.
-
May 2021
Reroofing - roof system overlay - install tpd, replacing new sky lights.
-
May 2021
Reroofing - roof overlay system - instlall tpd. replacing new skylights.
-
Apr 2023
Clean up of asbestos-containing fire debris. remove/dispose of asbestos floor & wall finishes, no structural demolition/modificaitons.
-
Aug 2025
Base building improvement: repair fire damage of e) 2nd & roof fl. structural improvement thru without occupancy. repair fire damged framing, n) structural upgrade, n) const of stairs, n) ada complaint restrooms, non-bearing partitions, n)skylight, lights. comply 202299820.
-
Jul 2026
Revisoin 202412126716- title 24 to include lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring, new replacement main switchboard and panel for new elevator.