850 Brannan Street
South Of Market · San Francisco, CA 94103
-
1945
Built as an industrial building, recorded as occupied by Gilmore Steel.
-
Sep 1984
Additions alterations or repairs.
-
Nov 1984
Add 2 fls., new surfaces & new roof.
-
Jun 1985
Revised mechanical air support, scope of beam fineproofing.
-
May 1986
Construction new entry & elevator lobby off.
-
Jun 1986
Construction of tenant improvements, including partitions.
-
Oct 1986
Alterations to shell to install new.
-
Mar 1987
New partitions creating wholesale exhibition show room.
-
May 1988
Alteration basement to revise showroom layout/add restrooms.
-
Nov 1988
Vault iii store spaces.
-
May 1989
Multiple wholesale merchandise showrooms on 3rd & 4th floor.
-
May 2000
Tenant development incl new non-bearing partition walls, doors & millwork at 3rd floor.
-
Jan 2004
Installation of new fire alarm system at 850 brannan st.
-
Aug 2006
T.i. to existing vacant space- drywall partitions, acoustic ceilings, electrical, plumbing, hvac and finishes. note: sprinklers & kitchen fire suppression on seperate permit. change of occ. from m to b. located on 1/f.
-
May 2007
Additions to existing fire alarm system. additional include 1 speaker/strobe, 1 strobe, 1 monitoring module & 1 relay module due to a remodel of tenant space on g/f. also includes relocation of 2 smoke detectors.
-
Jun 2008
Roof maintainance, unclog drains (roof) re-seal all cracks & will coat the repairs with acrylic paint. coat roof with emulsian & paint while with acrylic coating.
-
May 2011
To obtain final inspection for work approved under permit application 200806124244 all work is complete.
-
Sep 2011
Remodel of existing restrooms to meet disabled access requirements at basement level. barrier removal.
-
Aug 2018
Ab-017. demolition of interior to include: non-bearing part. demolition, interior ceiling grid demolition: uptruned sprinkler heads upon removal of ceiling grid as required fire sprinklers deferred under separate permit. int. carpet demolition. no structural work: existing columns, k braces & load bearing walls to remain in existing.
-
Nov 2018
Removal of existing glazing at southern courtyard wall for future nanawall. no struc'l work. revision to pa 2018-0813-7227. all demolition per ab-017. removal of wall and facade stucco @ brannan st to provide openings for future glazing (under separate permit). vertical & horizontal expansion of existing taqueria.
-
Jan 2019
Install windows/storefront at brannan st & courtyard.add rooms, kitchenette, restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks, ramps, sign).no change of use/occupancy.ref permit application 201808137227 & 201112140669.
-
Mar 2019
Demolition all pendents and relocate 17 in area of new construction area of work for warm shell preparation.
-
Aug 2019
Electrical work only ref 201901301670. electrical work only. installation of indoor lighting in permittted pdr/busines use. installation of outdoor: lighting, controls, motion sensors, & shut-off controls. connect new lighting fixtures to existing panels.
-
Mar 2024
2nd fl tenant improvement ste 210 selective interior non structural demolition and construction. adding new street facing windows. suite to remain unoccupied until completion of the project. in accordance with sfbc ab-17 access upgrades will be deferred.
-
Aug 2026
Interior tenant improvement consisting of new interior partitions.