37.7720, −122.4052 A locator map appears here once a Mapbox token is configured.

866–888 Brannan Street

South Of Market · San Francisco, CA 94103

  • Built 1920
  • Office building with ground-floor retail
  • 4 stories
  • Zoned UMU
  • District 6
  • Historic status: historic resource
  • Individually listed on the National Register
37.7720, −122.4052 Street View appears here once a Google Maps embed key is configured.
112,470 sq ftBuilding area
31,588 sq ftLot area
33Rooms · 8 baths
  1. 1920

    Built as an industrial building, recorded as occupied by National Carbon Co. Engineered by Maurice Couchot.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  2. Oct 1981

    Additions alterations or repairs.

    Complete Permit 8109382S $$$ $8,661,000
  3. 1982

    Listed on the National Register of Historic Places as part of the National Carbon Co. plant.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  4. Dec 2011

    Const of a new lobby and entrance on the 1st fl. new basement lobby, new exits, new fire rated roll down door at existing ramp. 2nd fl reconfiguration of the exit stair to the 1st fl. new elevator, mep. fire/life safety under separate permit.

    Complete Permit 201112140669 $$$ $1,300,000
  5. Dec 2011

    Exterior building restoration to the windows storefront, curtain wall, and entrance systems.

    Complete Permit 201112281420 $$$ $1,700,000
  6. Feb 2012

    Interior non structural remodel on all floors of existing restrooms, showrooms, and corridor configurations. all m.e.p. under separate permit.

    Complete Permit 201202013345 $$$ $2,100,000
  7. Mar 2012

    M.e.p. work associated with permit application 2012-0201-3345 and 2012-0131-3268. new cooling tower, rooftop mechanical equipment and associated m.e.p. throughout building. all architectural and structural under separate permits. mep only.

    Complete Permit 201203135932 $$$ $2,200,000
  8. Mar 2012

    Remodel of existing lobby & atrium. remodel balconies on 2nd, 3rd & 4th floor. enclose penthouse meeting room on 5th floor. includes change of use to office/ipdr. all mep fire alarm & sprinkler under separate permit.

    Complete Permit 201203146059 $$$ $2,200,000
  9. Mar 2012

    Arch & stru work to support mechanical & electrical upgrades throughout building. new elevators & floor infill at mezzanine. mep and life safety under seperate permit.

    Complete Permit 201203216563 $$$ $2,000,000
  10. Dec 2012

    Interior full floor tenant improvement on the 4th floor office space. mep and fire life safety under separate permit.

    Complete Permit 201212286968 $$$ $2,350,000
  11. Jan 2013

    T.i. to consist of new non structural partitions, new acoustal ceiling, boards ceiling, new kitchen equipment. new support shafts on the 5th fl & roof levels. new mechanical platform at the roof for existing ac unit.

    Complete Permit 201301178225 $$$ $685,000
  12. Feb 2013

    4th floor-m.e.p work associated with approved ti permit application 2012-1228-6968.

    Complete Permit 201302120049 $$$ $200,000
  13. Jan 2014

    Construction of non structural partitons, doors/framing/hardware/millwork, drywall, acoustic ceiling tile and grid, finishes.

    Complete Permit 201401025451 $$$ $750,000
  14. Jan 2014

    2nd floor: interior new structural t.i. of existing office space new partitions and finishes. mep, fire alarm, and sprinkler on seperate permit. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.

    Complete Permit 201401216719 $$$ $165,000
  15. Apr 2014

    Construction of non structural partitions, doors/frames, hardware, millwork, drywall, and acoustic ceilings grid/tile finishes. partial ti 1st fl with selective democompliance with ord 155-13 not required.

    Complete Permit 201404143185 $$$ $1,700,000
  16. Jun 2014

    Office tenant improvement to include new interior partitions, ceiling and floor finishes. mep sep permit; compliance with ord no. 155-13 not required.

    Complete Permit 201406047477 $$$ $3,000,000
  17. Jun 2014

    Exterior building upgrades - new windows & skylights. mep and structural deferred. n/a ordinance #155-13.

    Complete Permit 201406057566 $$$ $3,000,000
  18. Jun 2014

    Mechanical and electrical for ti on 3rd fl. compliance with ordinance no. 155-13 not required.

    Complete Permit 201406168404 $$$ $750,000
  19. Jun 2014

    3rd floor: t.i. to consist of demoltion of partitions. new glazing doors. mep life safty under seperate permit. n/a for the maher ordinance #155-13.

    Complete Permit 201406198836 $$$ $2,340,549
  20. Jun 2014

    T.i. for new restaurant at ground floor. work includes new kitchen, partitions, fixtures, finishes, equipment, lighting, mechanical. no exterior work. fire protection under separate permit. maher n/a.

    Complete Permit 201406300004 $$$ $750,000
  21. Oct 2014

    2nd floor: mep to 2014.0121.6719. t.i. to existing space. ** maher: compliance with ordinance no# 155-13 not required **.

    Complete Permit 201410310436 $$$ $92,000
  22. Mar 2015

    This project is phase 3 of a t.i., expansion for airbnb. demolition of shear alls new shear walls new int. partition, glazing & doors, new mep will be on separate permit. new data & av distribution, new kitchen & dishwashing. modification to the fire sprinkler and alarm system on separate permit.

    Complete Permit 201503201442 $$$ $1,086,750
  23. Jan 2016

    Tenant improvement on the 2nd and 3rd fl to include construction of non structural partitons, doors, frames, hardware, millwork, acoustic, banners, finishes. mep deferred.

    Complete Permit 201601197378 $$$ $2,356,000
  24. Mar 2017

    2/f- construction of non-structural partitions, new doors, frames, hardware, millwork, drywall, acoustic banners, finishes and modification of an existing shear wall. n/a ordinance #155-13.

    Complete Permit 201703201858 $$$ $2,645,000
  25. Aug 2023

    4th fl - ti including construction of new non-structural partitions, new accoustical grid & tile ceilings & gyp board ceilings; new electrical & lighting, new finishes throughout, new mechanical, electrical & plumbing equipment.

    Complete Permit 202308164591 $$$ $1,500,000
  26. Jan 2026

    4th fl - interior ti to include selective demolition and construction of non-structural partitions, finishes, ceiling and millwork. mechanical/electrical under separate permit.

    Complete Permit 202601073338 $$$ $350,000

DBI holds 306 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 306. 15 of them are nominal $1 street-space or sidewalk permits.