37.7819, −122.4025 A locator map appears here once a Mapbox token is configured.

320–330 Clementina Street

South Of Market · San Francisco, CA 94103

  • 276-unit apartment building
  • 13 stories
  • Zoned RC-4
  • District 6
37.7819, −122.4025 Street View appears here once a Google Maps embed key is configured.
175,046 sq ftBuilding area
49,878 sq ftLot area
276Residential units
  1. circa 1969 to 1971

    The Redevelopment Agency photographed the property.

  2. 1971

    Built.

  3. Dec 1985

    Install therma-stak economizers existing boiler.

    Complete Permit 8513789 $$$ $21,000
  4. Jul 1992

    Install emergency generator.

    Complete Permit 9211069 $$$ $114,700
  5. Jul 1992

    Install emergency generator.

    Complete Permit 9211070 $$$ $114,700
  6. Dec 1992

    Epoxy pressure injection walls.enlrg ftngs. strengthn column.

    Complete Permit 9221699 $$$ $280,100
  7. Jun 1996

    Install 2 60kw gas fired cogeneration units on new conc slab.

    Expired Permit 9611472 $$$ $87,500
  8. Mar 2001

    Reroofing.

    Complete Permit 200103033410 $$$ $258,000
  9. May 2002

    New grading at parking lot, new landscap, irrigiation, flatwork, trash enclosures&security fencing&gates.

    Expired Permit 200205317982 $$$ $300,000
  10. Nov 2002

    Install a new fire alarm system.

    Expired Permit 200211201891 $$$ $24,000
  11. Nov 2002

    Installation of new fire alarm system.

    Issued Permit 200211201886 $$$ $24,000
  12. Feb 2003

    Waterproofing repairs 0 eterior wall painting and repair.

    Complete Permit 200302207893 $$$ $1,380,000
  13. Sep 2003

    Install new fire alarm system @ entire building.

    Issued Permit 200309185179 $$$ $110,000
  14. Jul 2004

    Replace (in kind) of damaged sliding glass doors h.m. doors and alum windows and/or adjustment.

    Expired Permit 200407239628 $$$ $185,000
  15. Dec 2009

    Public housing. site improvements including courtyard paving, landscape irrigation system, outdoor amenities, metal fence, accessible entrance and loadin area, outdoor lighting. replace existing ventry canopy, sidewalk replacement with handicapped ramp.

    Complete Permit 200912183488 $$$ $458,000
  16. Feb 2012

    Remove & replace existing cogeneration unit and hot water storage tank. new unit in same location & weigh less.

    Cancelled Permit 201202144152 $$$ $400,000
  17. Jul 2012

    Emergency replacement of fire alarm system under plan of action per sffd(permit for phase i only). replace existing pullstation with new addressable. replace existing bell with new horn strobes. new panel to the control station monitored.

    Complete Permit 201207195226 $$$ $46,000
  18. Oct 2015

    Moh rad priority project. clementina tower are identical concrete buildings with 13 floors of seior and disable housing, scope of work includes structural, life safety and accessibility upgrades and general renovations.

    Complete Permit 201510301361 $$$ $36,000,000
  19. Sep 2017

    Install new facu. new grpahic annunciator, 5 power supplies, 1 man pull station, 26 smoke det, 54 monitor modules, 6 sounder modules, 4 relays, 45 horn/strobes, 8 strobes, 156 low freq sounders, 7 low freq sounder strobes.

    Complete Permit 201709148259 $$$ $82,500
  20. Sep 2017

    Replace and upgrade existing system. install facu, new graphic annunciator, 5 power supplies, 1 manual power station, 26 smoke detectors, 41 montor modules, 6 sounder modules, 4 relays, 46 horn/strobes, 8 strobes, 156 low requency sounder, 7 low freq sounder strobes.

    Complete Permit 201709148260 $$$ $79,500
  21. Feb 2018

    Installation of drainage for fire pump rooms. fire pump rooms covered by permit also ref. permit application 201510301361. also includes drainage for storage rooms.

    Complete Permit 201802272335 $$$ $120,000
  22. Apr 2018

    Errcs-emergency responder radio coverage system in existing moh building. reference site permit permit application 201510301361 (rad priority) & permit application 201803224305 revision for door replacement & intumesent paint.

    Complete Permit 201804065715 $$$ $100,000
  23. Apr 2018

    Errcs-emergency responder radio coverage system in existing moh building. reference site permit permit application 201510301361 (rad priority) & permit application 201803224305 revision for door replacement & intumesent paint.

    Complete Permit 201804065719 $$$ $100,000
  24. Jan 2019

    As-builts for permit application 201804065715. additional rf coverage for floors 4-6 and elevator floors 7-13.

    Issued Permit 201901241092 $$$ $99,621
  25. Jan 2019

    Install retaining wall and steps for sffd access.

    Complete Permit 201901251277 $$$ $100,000
  26. Feb 2019

    To comply with n.o.v # 201804841: one unit- new electrical and plumbing for kitchen remodel. kitchen cabinets, drywalls (full remodel repair like for like).

    Complete Permit 201902142898 $$$ $89,000
  27. Jul 2021

    Replace like for like wall board and paint due to water damage, some walls are around trash chute and are two hour fire rated metal stud walls. floors 2-6 and common trash rooms.rooms 715/709/713/711/707/607/611/615/511/515/507/407/413/415/411/307/311/315/211/107/111.

    Complete Permit 202107134222 $$$ $51,000

DBI holds 67 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 67. 11 of them are nominal $1 street-space or sidewalk permits.