360–368 Clementina Street
South Of Market · San Francisco, CA 94103
-
1948
Built as the gymnasium of St. Patrick's grammar school, which stood at the north-east corner of 5th and Clementina streets until it was demolished in 1965.
-
Mar 1982
Additions alterations or repairs.
-
Jul 1985
Renovate restrooms & remodel locker room into lounge.
-
Nov 1988
Provide additional classroom exit per sq ft fire dept.
-
Aug 1993
Reroofing.
-
Sep 1993
Remod-kitchen & bathroom-entrance & drs(h/c access)repr gym floor.
-
Mar 1994
Change of occupancy to e-3.
-
Aug 1994
Revise appl#9404176 for mtl stud & 1 piece tempered glass.
-
Jun 1999
Reroofing.
-
May 2009
Accessibility upgrade for a day center - restroom remodeling, add handicap ramps inside building.
-
May 2009
Conversion of e daycare center to new office building. separation for 4 new office spaces. new accessible entrances and restrooms.
-
Aug 2009
Install 5-rooftop package systems with ductwork. (building. permit appl. for shell: 2009/0529/9400).
-
Oct 2009
Revision to appl #200905299400: add mezzanine (692 sq ft) in tenant a with stair. relocate restrooms & partition walls.
-
Oct 2009
Verify/add additional address nos. 360, 366, 368 clementina street and 12 gallagher lane.
-
Jun 2011
Fabricate and mount living wall to side of concrete building. mount living wall with unistruts. 7'0" high x 24'0" long x 7" deep living garden sign.
-
Oct 2014
Ground floor and mezz: t.i. includes the demolition of non-structural partitions and building. new non structural partitions. all new or revised meps and life safety under seperate permit. building is not fully sprinklered.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update