954–960 Howard Street
South Of Market · San Francisco, CA 94103
Permit history
-
Nov 1992
Enterprise zone(seismic/interior remodel).
-
Jun 2005
For 2 grab bars @ restroom.
-
Oct 2016
Change of use only. existing one-story industrial space to be converted to retail use. no change to interior space or exterior changes. retail display of sports equipment only.maher ordinance - extended n/a.
-
Oct 2016
Comply with complaints: barrier removal: new h.c. toilet to replace non complying toilets. remove front door and stair. new auto doors located at center front bay. new stairs and lift. repair conc. recess panels at existing & new door locations, modify existing windows at door locations.
-
Jan 2020
Interior upgrade/vertical addition with addition of mezzanine level and new floor & office space. additionally the demolition of this project includes the removal of illegal use and occupancy as per violation 201328521. ** maher ordinance applicable **.
-
Apr 2021
Partial demolition of building. front facade to remain. reference to site permit permit application 202001131764s. no grading work under this permit application.
-
Jun 2021
Shoring / excavation to support construction on site. reference to permit application 202001131764-s.
-
Jul 2021
Install 6" underground fire service only - 10 feet.
-
Apr 2022
New overhead wet automatic fire sprinkler system (289 heads); incl standpipe and ug.
-
Aug 2022
Altered site permit: 14-story vertical addition: 12 stories of mass timber construction atop of 3-story/type-1a base building (ref bpa#202001131764). note: the change of occupancy and related build-out for the base building structure to occur on bpa 2026/0323/8063-full permit.
-
Jul 2026
Ti floors 1-3 of existing structure, approved under 2025-007856prj. per planning approval floors 1-3 existing will contain pdr, business & residential uses. partition the space into residential units, business space, pdr & amenity space, install mep fixtures & infrastructure to serve residential units, pdr, &.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the year the building went up, the architect and builder and the early tenants. Submit an update