1017–1019 Market Street
South Of Market · San Francisco, CA 94103
Permit history
-
Jun 1984
18" prejection awning to change face.
-
Jun 1984
Additions alterations or repairs.
-
Oct 1989
Ewo.
-
Feb 1990
Emergency repairs, to yellow tagged building.
-
Aug 1991
Reroofing.
-
Sep 1997
U. m. b. seismic retrofit.
-
Nov 2012
Remove plaster from brick walls and ceiling. demolition corridor partitions, misc partitions remove doors and frames.
-
Dec 2012
Building core improvement. renovate stairs enclosure, toilet & elevators; enclose rooms for new main eletrical service. future permits for sprinklers, fire alarm, mechanical, plumb & electrical submitted under separate permit. low rise building.
-
Dec 2012
Replace all windows at reroofing building (southside) in kind, not visible from street.
-
Jan 2013
Installtion of roof top mechanical equipment for future tenant improvement work.
-
Feb 2013
Interior modifications, building shaft for future tenant use per 708 exception 7. create new floor openings between 1st floor and basement, rebuild front half of 2nd floor infilling openings and making floor one level. build new building lobby.
-
Feb 2013
Replace 1st & 2nd fl storefront & entries on market st. enlarge & replace 1st fl windows on stevenson st.
-
Mar 2013
Existing sprinkler system upgrade. install new back flow preventer and fire pump. ref app#201302190463.
-
Mar 2013
Install new fire alarm system in core building.
-
Apr 2013
Install 2 water source heat pumps, 3 exhaust fans, 28 fire smoke dampers. mechanical work for permit application 2012-1205-5468.
-
May 2013
Tenant improvements to the 5th floor, includes construction of reception area, break area, one conference room.
-
Jul 2013
Mechanical work for 201305298092. four heat pumps no fsds, over 2000 cfm. sprinklers and ls on sep permits. jjc.
-
Dec 2013
Interior commercial tenant improvement & fit-out of existing building totalling approx 75, 000 sq ft. improvements comprise open office with distributed offices & mtg rms, pantrys, break area, new 1-story staircase element & storage rooms. (interim controls see attached).
-
Dec 2013
Provide new pendent sprinklers for new ceilings in new tenant improvmenent rooms. modify existing upgright sprinklers at new full height interior partitons.
-
Dec 2013
Install hvac system consisting of 45 water service heat pumps, 1 power exhaust fan, 2 split system heat pumps, 3 ceiling exhaust fans, 17 fsds, mechanical work for building permit appln #201312194666.
-
May 2014
New fire alarm devices added to new tenant build out in an existing building to include: (2) power supplies (43) modules (16) smoke detectors (35) duct detectors (65) horn/strobes (10) strobes. ref p/a 201312194666.
-
Nov 2014
Tenant improvement of existing 1-story commercial shell space to restaurant/cafe with beer and wine. new plumbing, electrical, new restrooms, office space for restaurant.
-
Jan 2015
Sprinkler system t.i. dropped ceilings- protection above and below ceilings. add 23 heads and relocate 4- new end of line restraints. t.i. 201411212279.
-
Feb 2015
Provide & install 2 water source nest pump systems including air distribution ducting, provide & install toilet exhaust system. work associated with t.i. permit application 201411212279.
-
Oct 2020
Installing 2 anchors at 1019 market. the anchors will hold market lite professionally rated outdoor string lights with 3 ft in diameter lanterns. power will be sourced from 510 stevenson st.
DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update