1911
It served first as a temporary city hall, and has been a hotel since 1916.
-
Feb 1982
Additions alterations or repairs.
-
Mar 1982
Additions alterations or repairs.
-
May 1982
Building use: rest./lobby.
-
Dec 1989
Ewo ( s ).
-
Jan 1990
Replace total 100 per floor aluminum into existing double hung.
-
Jul 1990
Remove and replace all bathtubs & install new flow valves.
-
Sep 1991
Install sprinklers in basement ground floor lobby.
-
Sep 1993
Reroofing.
-
Nov 1995
Interior tenant improvements (1st floor).
-
Aug 1998
Response to notice of violation and meeting with jim whipple.
-
Feb 2000
Revisions to pa-9900216-permit for 1990 work done with out permit, includng limited ada toilet access u.
-
Feb 2000
Reactivate expired permit application 9903420 for final insp & for as built cond. ath of travel garage & h.c. elev.
-
Feb 2000
N.o.v. access adaptable guest room bathroom doors width project.
-
Nov 2000
Nov 12-4/96-item #48-provide access & adaptable bathroom doors in prev work-to establish record as 4.
-
Sep 2002
Repair & replace shower stall enclosures & bathroom floor tile in 168 guestroom bathrooms.
-
Mar 2006
Remove some partition walls. replace countertop and undercounter cabinets, undercounter refrigerator and storage shelves. patch wall paint, tile replacement occupancy 19.
-
May 2006
Construct new walls. modify existing flooring, relocate existing casework. relocate existing plmg items, relcate existing light fistures, instll new doors, install new wall treatments install new furniture, relocate existing graphics, patch, prime and paint walls, deilings and or soffits.
-
Oct 2007
Replace of existing edwards panel with new unimode 9600 panel & one for one pull stations & smokes for compatibility. connect existing devices to new panel & monitor per nfpa 72. remote system monitoring.
-
May 2011
Install distributed antenna system on all levels inside hotel. wireless radio equipment installed in basement. remote units on each floor closets and antenna throughout hotel.
-
Apr 2017
New partial height wall; remocate 2 cooling fridge; new work room hand sink; new condiment cart; patch prine and paint walls; soffits and ceilings; retrofit existing signage with new logo (under separate permit).
-
Jul 2019
Interior alteration of existing hotel lobby, to include a lobby bar & grab and go.
-
Nov 2019
Voluntary replace existing fire alarm control unit and remove annunciator with new facu and annunciator, per sffd approved plan of action phase 1 only.
-
Jan 2021
Rehabilitation to existing elevators 1 & 2 within an existing shaft. improve fire rating, mechanical stems and structural intergrity of shaft. custom elevator equp to fit withing existing shaft & repair surrounding finishes. size of elevator will not alter preserve historic condition.
-
Jan 2022
Install a new clean agent fire extinguishing system for the exiting basement phone room.this permit shall also include the actuation of a new pre-action system under separate permit.
-
Feb 2022
Basement - install a single interlocking pre-action system for the basement phone room.
DBI holds 156 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 156. 10 of them are nominal $1 street-space or sidewalk permits.