800–830 Market Street
South Of Market · San Francisco, CA 94102
-
1928–1932
The downtown office of the Castle Building Company. In its four years the firm built the earliest known group of split-level houses in the Sunset District.
-
Sep 1985
Replace existing evaporative cooler with new.
-
Mar 2000
Replace existing primary entrance with new accessible entrance.
-
Apr 2003
Fire pump & riser for high rise-existing building per high rise ordinance. ventication of room. sepa.
-
Apr 2007
Core & shell upgrade on all floors of existing building. to install new accessible elevators. new elevator lobbies and new accessible restrooms. mechanical & fire protection under separate permit.
-
Feb 2008
Exterior alteration of ground and second floors, retail facade. from 3rd to 8th floors, work under this permit consists of painting, facade repair in kind, and painting. mep. under seperate permit.
-
Mar 2008
New fire protection for entire building plus life safety installation.
-
Dec 2008
T.i. for new retail store on 1st., 2nd., 3rd. floors & basement. work includes installation of new egress stair new elevator new fixtures, finishes, furniture, millwork. new storefront section @ building. corner. mepincluded in this permit. fire protection under separate permits.
-
Mar 2009
M.e.p work for new retail store in basement, 1st, 2nd & 3rd floor. t.i. permit with full ada compliance on permit application 2008-1219-8917, m.e.p. work only. fire protection under seperate permit.
-
May 2010
Abandonment of sub-sidewalk space along ellis street. utility relocations for the central subway project. demolition work under separate permit. handicapped access upgrade to restrooms service the area of remodel.
-
May 2010
3th, 4th & 5th floors t.i. including new non-structural partitions, all new or revised hvac, electrical, plumbing & life safety work will be fully built engineered. mechanical & electrical in this permit. building fully sprinklered.
-
Jul 2010
7th. floor.: t.i. include building new non-structural partitions. all new or revised hvac, electrical., plumbing & life safety work is design build & included in this permit submittal. building. is fully sprinklered.
-
Jul 2010
Office ti on the 6th fl incl, new non struc. partitions. all new or revised hvac, electrical, plumbing and life safety work is design build and included in this permit submittal, building is fully sprinklered.
-
Sep 2010
7th floor- constuct 6 offices and 1 pantry. mechanical and electrical are included.
-
Oct 2011
8th floor select demolition, construction of new walls, finishes, electrical, lighting, mechanical & plumbing. mechanical, electrical, plumbing, life safety under separate permit.
-
Oct 2011
Mechanical and electrical work for tenant improvement on the 8th floor. ref: architect 2011-1005-6160.
-
Apr 2012
Interior remodel: new walls, new electrical, new plumbing. structural work for new metal pan stairs to lower level sales area to be under separate permit.
-
May 2012
Ground floor: barrier removal provision of ramp steps and shell improvements, accessible restroom is not included in scope and will be provided with t.i. for new tenant. sp, fire alarm, mep's under seperate permit. demolishing and building some new nonstructural partitions. building fully sprnklered.
-
Oct 2017
5th floor - project involves modification of existing tenantn improvements to include construction of non-load bearing partitions, modifications to ceiling grid & tile, new light fixtures, reuse of existing doors, new millwork, relcoation of existing sink, & new finishes.
-
Jun 2018
2nd and 3rd floors - interior remodel to return 3rd floor of existing diesel retail store back to building owner. demolition & infill of existing stair opening between 2nd & 3rd floors. non-structural demolition at 3rd floor. new non-structural partitions at 2nd floor to relocate stock room. replacement of lighting.
-
Sep 2018
Fourth fl ti interior only. work includes new partitons, new floor, ceiling finishes and bathroom finishes. mep, f/a and sprinklers under separate permit.
-
Jan 2019
4th fl office ti modify hvac, new lighting and controls. new power outlets plumbing connections for break area ref 201809049051.
-
May 2019
6th floor - non structural ti. new partitions, flooring, lighting, furnisihngs and finishes. no change to other floors or common area all fire sprinkler/alarm under sep permit.
-
Sep 2020
3/f: t.i: non-structural partitions, flooring, finisehs, fixturse. memorialize cua 2019-014033 to change from m to b occupancy.
-
Aug 2022
3/f: t.i.: interior demolition of non-structural elecments. new interior partiti8ons, doors, finishes, ceilings, lighting, mechanical & electrical receptacles, switches. mechanical & electrical under separate permit.
-
Oct 2022
Mechaninc and electrical scope of work under ti building permit ref permit application 2022-0809-0154.
DBI holds 103 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 103. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update