799 Market Street
South Of Market · San Francisco, CA 94103
Permit history
-
Oct 1981
Additions alterations or repairs.
-
Sep 1984
Shell building improvements include structural seismic upgrading.
-
Oct 1984
Interior demolition removal of partitions, toilets, susp.
-
Oct 1985
Interior work to the top 6 floors office space.
-
May 1986
Int demolition, tenant improvements.
-
Apr 1991
Non structural interior, tenant alterations.
-
Jan 1998
Tenant improv/relocat restrms/new elev/escalators/reloc part.
-
Feb 2000
Oti 1 7th floor, el, me, sp & ls.
-
Feb 2000
Oti 1 8th floor, el, me, ls & sp.
-
May 2008
Replacement of existing fire alarm system. installation of new notifier fire alarm system.
-
Feb 2010
Ross - dress for less; misc. replacement of finishes, removal and relocation of dressing areas. removal and relocation of cashier's stations. misc. lighting and ceiling modifications. work on basement, 1st/street level, 2nd and 3rd levels. sprinkler & fire alarm work under seperate appl.
-
Jun 2013
8th floor tenant improvement to add prtitions doors & finishes. all mep, life safety, & sprinklers to follow on separate permit.
-
Aug 2013
Build out of tenant space on 4th and 6th fl to consist of new non load bearing alls and new restrooms and shower. also to include alterations to vav boxes ductwork, air distribution and thermostats on 6th fl.
-
Oct 2013
Tenant improvement on 4th floor to construct new partitions doors, millwork, and finishes for spec suite. mep, life safety, sprinklers on separate permit.
-
Mar 2014
New tenant improvement to construct new non structural partition doors, millwork and finishes. previously permitted as a spec suite and all ada approved under 201310310778. mep, ls, sprinklers on separate permit.
-
Sep 2014
Remove and replace building chiller add vfds to chw pumps.
-
Feb 2016
5th floor: modification of existing t.i. to include construction of non-load bearing partitions, new light fixtures including reswitching, new office doors/frames, new millwork, sinks, finishes and accessible restrooms. n/a for maher.
-
Jun 2016
Floors: 6&7: partial t.i. to build partitions, doors, millwork & finishes in existing tenant space. mep, communicating stair and fire sprinklers/alarms on separate permits; maher n/a.
-
Aug 2016
6 &7 floors: title 24 electrical to install new lighting and power, please refer to permit application 201606170309 for ti work; maher n/a.
-
Aug 2016
Structural work to install stairs between 6th & 7th floors refer to 2016-0617-0309 maher na. fire alarm and sprinkler deferred.
-
Apr 2017
5/f #500- full floor revision to permit application 201608245850, commercial t.i., demolition and new non bearing partitions, new office doors & frames, new millwork, new finishes. buildout new conference rooms. n/a ordinance #155-13.
-
Mar 2018
Raise single elevator (1) level to provide roof access. add new occupiable roof deck with new lighting, landscaping, gas fire pit, storage space, mechanical screens & guardrails.
-
Sep 2024
Reroofing.
-
Jun 2026
6th and 7th floors: partial interior tenant remodel at 6th and 7th floors. additional power data, reception area closet reconfiguration. plumbing and electrical included, no mechanical.
DBI holds 208 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 208. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update