Carroll and Tilton Building
735 Market Street
-
1907
Built.
-
December 1908
Permitted for Claus Spreckels: a six-storey steel and masonry commercial building, shops below and offices above, 50 feet on Market Street and 170 feet deep, its sandstone front composed as base, shaft and capital with paired Tuscan and Corinthian pilasters and a cornice of lion heads and swags. Designed by Willis Polk while he ran Daniel Burnham's San Francisco office.
-
March 12, 1909
James Campbell contracted to put up a building.
-
September 1927
The Schwabacher-Frey Stationery Company extended the shop window across the whole east side of the front; it put up a neon sign in 1938.
-
1963
The Diamond National Corporation refitted the offices floor by floor and remodelled the storefronts and lift lobbies.
-
Aug 1982
New construction.
-
Jul 1988
Tenant improvement.
-
Jul 1988
Tenant improvements.
-
Oct 1988
Revisions as noted on revised plans.
-
Dec 1998
Umb-to comply with 3403-new 2 hr roof and stairs to elevator.
-
January 1999
A certified tax-credit rehabilitation began: a seismic retrofit with shotcrete walls and a new steel roof, the sandstone front re-anchored and the cornice repaired, all the original front windows kept, a new storefront, and openings on the fifth floor into the new hotel built next door to the west.
-
Sep 2000
Oti-1 el, me, ls, sp at 1st fl.
-
Oct 2000
Oti-2 1st fl me.el.
-
Jun 2004
Partial remodel of offices on 3rd floor removal of condo "model" features (from sales office).
-
July 27, 2004
Listed on the National Register of Historic Places as a significant example of Willis Polk's commercial Beaux Arts work.
-
Apr 2005
Remodel existing space to include partitions new furniture fixtures and finishes no exterior work.
-
Jun 2005
Hvac adding 1-f/c unit with related duct work etc. and revisions 2 existing fan coil units ground fl.
-
Apr 2006
Oti-1, 4th floor, sp.
-
Nov 2015
4th fl ti. minor demolition of 1 wall and finishes. minor counter work in pantry.
-
Feb 2017
Add a men's and woman's restroom on the basement level. mep and life safety under separate permit.
-
Jul 2017
Remove existing walls, doors, finishes. construct new walls, doors, sidelights and install new finishes.
-
Sep 2018
Update finishes on level 5 reception space. constructur new reception space and sales office on level 6 insertion of convience stairs between level 5 & 6., ep/sprinklers/fir alarm on sep permit.
-
Nov 2018
6th fl - demolition only - north side of floor existing restroom to remain. selective demolition of non bearing walls, finishes. maintain sprinkler & fire alarm.
-
Jan 2019
6th fl: partial floor ti. new non-bearing partitions, ceilings, finishes, sprinkler, fire alarm & mep under separate permit.
-
Mar 2026
T.i. for 1st floor + basement interior built out of existing sapce to create museum-style immersive exhibits. new non-load bearing partition, finishes, lighting, mep. fire sprinkler on separate permit.
DBI holds 95 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 95. 7 expired or cancelled permits are not shown.
Nearby
- 725–731 Market Street Same street
- 744 Market Street Same street
- 757 Market Street Same block
- 765–781 Market Street Same block
- 721 Market Street Same block
- 715–719 Market Street Same block
- 1 Grant Avenue Around the corner
- 39–41 Grant Avenue Around the corner