765–781 Market Street
South Of Market · San Francisco, CA 94103
Permit history
-
Aug 1985
New construction.
-
Dec 1994
Erect a one story performance theater.
-
Feb 1998
To erect 36 story 400 units hotel/condo/retail/parking.
-
Jul 2001
Interior tenant renovation, combinging two new core condo units, with new non-structural walls, new f.
-
Feb 2002
New interior build out of ph3d and gph sprinklers under separate permit.
-
Dec 2002
Renovate existing one unit. work includes new partiions/nw lighting/nw finishes/nw mep work no fire.
-
May 2005
Build interior partition walls, install dry wall, install new doors, add new electrical, plumbing & hvac, move location of existing stair, install new wood flooring, install new tile in bathrooms.
-
Jun 2006
Installation of a new fire/life safety system. gradual replacment of existing simplex fire alarm system.
-
Feb 2007
Tenant improvement for new restaurant (amber india) on ground floor.
-
Apr 2007
1st and 2nd level hotel lobby to be renovated including offices, mtg rooms, public space, bar, restrooms, porte coachere and 4th street entry, and 4th street deli. kitchen exhaust duct work only.
-
Dec 2008
Tenant improvement of ground floor restaurant space with new finishes, structural and m.e.p. sprinkler and fire alarm under seperate permit.
-
Jul 2009
Renovation of existing ballrooms/coference rooms on basement levels. no exterior work. fire alarm and sprinkler under separate permit.
-
Sep 2010
Finish changes, bath & kitchen remodel, interior wall & ceiling modifications, millwork & demising wall modification to connect ajoining units for single tenant occupancy with new fire rated door assemblies.existing exits to remain.1 hr separation between units to be maintained.unit b, c, d will remain.
-
Feb 2012
40 guestroom ada modifications; remodel to conciege lounge & pantry guestroom bathroom backlit mirrors (electrical work - 1500 rooms).
-
Jul 2015
Renovate existing 4th floor fitness center & existing men's & women's locker rooms & add (4) new treatment rooms incl. new fcu's ductwrok & lighting. renovate existing 5th floor pool deck & convert to fitness center. infill existing pool & spa & remove existing shower & restrm. new finishes & equip thru n/a maher ordinance.
-
Apr 2017
Grand penthouse a- interior renovation of grand penthouse a in four seasons residences. work to include renovation of master bedroom, bath, closets & guest bedrooms, baths, closets; front entry foyer/hall; powder room, kitchen; dining room; family/living rooms; new media room.
-
Mar 2018
Interior renovation of existing non-accessible & accessible guestrooms, corridor, new finishes &fixtures, bathrms tub to shower conversions, new lighting very limited partition & rated wall const, no change to major plumbing & electrical. maher n/a.
-
Mar 2018
Interior renovation to public spaces of lobby area, incl lobby, registration, entry area, back of house area, administractive office, porte cochere, valet, cashier, valet storage, a new revolving door system & exit doors, lobby area and related 1st restrooms. maher n/a.
-
Jul 2018
Renovate non-accessible guestrooms on 4th & 5th fl. includes n finishes & fixtures, tub to shower conversion, n illuminated mirror, hvac & lighting e to remain. two n outlets. renovate to e corridors including new finishes only. only ffe sconces are replaced in kind. all other lighting e to remain.
-
Sep 2018
Ground fl. replace the driveway topping elements and perform water proofing repair at porte cochere sq ft marriott.
-
Jan 2019
#36f -new plm fix, tile, counter, tibs appl. new cabintry, pocket doors. trim & moulding. new recessed light fix, modernized shades. new hardwood floors and carpet and tile. new paint/wallpaper throughout. remove mstr bedrm opening, remove kit pony wall, remove ceiling projector/screen & wood panel.
-
Jul 2022
One unit: interior renovation including all finishes and fixtures. no work to exteiror of building, structural elements, fire life-safety or demising wll of unit.
-
Feb 2023
Residential interior remodel to individual dwelling unit within 765 market st. scope of work limited to one unit on story 31. interior alteratioin and repair of one unit c. kitchen alteration. alteration to existing baths. no structural work, no mechanical work. no modification to fire rate assemblies.
-
May 2025
Like for like replacement of 2 cooling tower and vfd on 3rd floor. 3 condensor water pumps and vfd 2nd floor.
DBI holds 557 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 557. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update