Kamm Building
715–719 Market Street
-
April 18, 1906
One of the handful of buildings left standing in the Central SoMa area after the earthquake and fire.
-
1908
Built.
-
January 3, 1912
Photographed.
-
1940
The Kamm/Morris Plan Company Building, designed by Bliss & Faville in 1905, was remodelled.
-
1950s
Remodelled again with Art Moderne influences by Hurt, Trudell & Berger. A building altered wholesale into a later style, it has lost architectural association with its original construction but may be significant for the period of the alteration.
-
1984
Known as the Morris Plan Co.; it was among the rated buildings of the city's Downtown Plan inventory.
-
Mar 1984
Alteration to lobby, carpet, ceiling, painting.
-
May 2000
Oti-1 6th floor el, me, l/s, sp.
-
Jun 2000
Oti-2 6th floor electrical mechanical.
-
Oct 2000
Structural bracing for building main mechanical unit & mechanical work on roof.
-
Nov 2007
Installation of a new fire alarm system throughout building. the occupied spaces will be provided with full coverage.
-
Jun 2008
8th floor office tenant improvements: new ceiling height partitions & doors, remove non-structural interior partitions & doors. modify lighting & hvac layout, mep & life safety system works will be under separate permits.
-
Jul 2008
Demolition some interior non-load bearing partition walls and door assemblies. construct new partition walls and door assemblies, provide new finishes throughout. mep and fire safety will be under a separate permit.
-
Sep 2008
Office tenat improvement: demolition on non-structural partition, building new partition and ada compliant millwork. mep will be filed under separate permits.
-
Sep 2008
5th floor mechanical to include providing heating & ventilation to office space provide heating ventilation & cooling to conference rooms. electrical work to include new lighting/title 24. ref arch permit application 200809111390.
-
Jul 2009
Demolition of non-load bearing partitions and door assembles. construction of new partitions and door assembles. mep, fire & life safety under separate permit.
-
Jun 2010
3rd floor-construction of non load bearing partitions, new office doors & glazing, partial new ceiling & grid. electrical & mechanical included. life safety & fire sprinkler under seperate permit.
-
Aug 2012
Remodel 1st fl & 2nd fl, restroom, office rooms. add new exit stair on stevenson st & replace existing stair. new catwalk that connects elevator lobby to south area of 2nd fl. all new lighting, mechanical electric + plumbing. sprinkler & fire alarm & sprinkler on separate permit. panic hardware req'd.
-
Jan 2013
7th floor-tenant improvement to demolition & construct non load bearing partitions. mechanical, electrical, life safety will be under seperate permits.
-
Jul 2013
Mechanical & electrical for t.i. retail space on ground level to relocate and add new equipment. refer to permit application 201307031108 for t.i. work.
-
Nov 2013
Tenant improvements, 1 small ti closet, furniture, 1 small split unit for ac. electrical outlets. 4th fl, partition 3rd floor.
DBI holds 172 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 172. 1 of them are nominal $1 street-space or sidewalk permits. 10 expired or cancelled permits are not shown.
Nearby
- 711 Market Street Same street
- 720 Market Street Same street
- 721 Market Street Same block
- 725–731 Market Street Same block
- 701–705 Market Street Same block
- 735 Market Street Same block
- 1–29 Third Street Around the corner
- 1 Kearny Street Around the corner