720 Market Street
Union Square · San Francisco, CA 94108
Public art
- Angel — Stephen de Staebler
Bronze; building facade; artwork is always accessible.
Installed 1989. De Staebler's own curriculum vitae records this bronze work as commissioned by the Geary-Market Investment Company in 1989, matching the building's Geary Street address.
Permit history
-
Apr 1983
Additions alterations or repairs.
-
Aug 1986
New construction.
-
May 1989
Office tenant improvements including partitions, walls.
-
Feb 1990
Office t/i incl. mechanical. electrical. arch.
-
Feb 1990
Outfitting of vacant around floor tenant space for retail.
-
Jul 1990
Cti-1.
-
Jul 1990
Cti-1.
-
Sep 1992
Cti i floor 8th (el me sp).
-
Oct 1992
Cti 2.
-
Feb 1993
Cti 1 fl-05 el me sp.
-
Feb 1993
Cti-1 4th floor el, me, sp.
-
Jun 1999
Oti-1 el. me. ls. sp. 9th floor.
-
Apr 2002
Oti-1, 3rd floor, lt, me, ls, sp.
-
Aug 2006
Oti-1 3rd floor, suite 300, el, me, ls, sp.
-
Sep 2006
Tenant improvement for 3rd floor- mechanical/plumbing/electrical.
-
Jun 2008
5th floor: tenant improvement. demolition interior partitions, construct new interior partitions. remodel bathrooms for ada accessibility requirements. add new lighting and repair ceiling.
-
Aug 2008
6th floor suite 600 - demolition, construction of 3 interior offices and 1 conference room (non-bearing partitions), hvac, fire protectio & electrical under separate permit.
-
Oct 2013
5th floor commercial t.i. with non-structural demolition, construction of interior partitoins, glazing (interior), doors, ceiling, mechnaical & electrical (power/signal & lighting).
-
Dec 2013
Suite#1000-10th fl. demolition of interior non load bearing walls & some ceiling grid, construction of new non load bearing partitions, new ceiling, new electrical (under seperate permit) and new finishes. fire sprinklers, fire alarm and mechanical changes under separate applications.
-
Jun 2014
Interior commercial tenant improvementfor cafe in existing retail space. construction of interior partitions, new finishes, cabinetry & furniture for cafe use. no change to existing structure or exterior.
-
Jul 2014
Construction of 1 conference room and 2 phone rooms. mechanical fire protection, electrical and life safety to be submitted under separate permit.
-
Aug 2014
Power & lighting work, relocating existing supply diffusers for new layout, add new return air grilles for the new layout per title 24 requirements, ref. to permit application 201407242058 for architectural permit.
-
Oct 2014
Revision appl #2013.1213.3123. work include structural, change counter design and mep included.
-
Dec 2014
Interior tenant improvement, non load bearing partitions, minor plumbing, electrical and mechanical.
-
Mar 2019
4th floor. inteiror demolition of existing non-structural parititon and new construciton of wall partitions.
DBI holds 91 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 91. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update